Loading...
HomeMy WebLinkAboutCLE201000203 Review Comments Zoning Clearance 2010-10-12Application for Zoning Clearance 0 CLE # 2d /0 Re),S Zoning Clearance = $35 4E, I OFFICE USEJQNLY Check# 6e),_/1924 Date: /4 UA0 PTY, A EIR—FYIEW ALL 3 SHEETS - ___ Receipt # �9_0q6 7 Staff: j)T - -PARCEL INFORMATION— Tax Map and Parcel: o'6060-6c'-6,0-6 5AC) Existing Zoning Parcel Owner:- (I C_6,Doro_+ Ori :R -C @1:,4. Parcel Address: 0/- CUYC�r �. )State —zip (include Jtiiteo'r floor) PRIMARY CONTACT aMln T(Dhf)a��, Who should we call/write concerning this proJfCftCJA--�,<,�(1, Address _3 -1z N laz <A_IoAmn_t� 11� city Y State Zip L Office Phone: �afmeli # -Fax# E-mailowa a6, �,4 &P",tartet APPLICANT INFORMATION Check any that apply: _ Change of ownership _ Change of use Change of name V New business Business Name/Type: lit aA wvg, T I Previous Business on this site Describe the proposed business including use, number of employees, number of shift , available parking s aces, qumber of vehicles, and any add' ional information that you can provide:� F-Andfav LA --\,u+L0nL *This Clearance will only be valid on the parcel for which it is approved. If you change, intensify or move the use to a new location, a new Zoning Clearance will be required. , I hereby certify that I own or have the owner's permission to use the space indicated on this application. I also certify that the information provided is true and accurate to the best of my knowledge. I have read the conditions of approval, and I understand them, and that I will abide by them. Signatur PrintedCZaj:E�� p \ APPROVAL INFORMATION Approved as proposed Approved with conditions Denied Backflow prevention device and/or current test data needed for this site. Contact ACSA, 977-4511, x117. No physical site inspection has been done for this clearance. Therefore, it is not a determination of compliance with the existing site plan. [ ] This site complies with the site plan as of this date. Notes: Building Official Date t Zoning Official Date A Other Official Date County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 Revised 04/28/08, 10/13/09 Page 2 of 3 ,1 r Intake to complete the following: Y/N is use m Ll, Hl or PDIP zoning? if so, give applicant a Certified Engineer's Report (CER) packet.. _.Wili_th_ere_be food preparation? If so, give applicant a Health Department form. Zoning review can not begin until we receive approval from Health Dept, FAX DATE Circle the one that applies' Is parcel on private well public r? If private well, provide Hea i epartmenl form, Zoning review can not begin until we receive approval from Health Dept. FAX DATE Circle the one that applie Is parcel on septic or M Y /0 Will you be putting up a new sign of any kind? If so, obtain proper Sign permit. Permit # Y/ Will there be any new construction or renovations? If so, obtain the proper Permit, Permit # Reviewer to complete the following: Square footage e of Use: l 3 y 0 / N ermitted as: /`-d'1 4 1. Under Section; Supplementary regulations section. Parking formula: Required spaces: // Y/ Items to e. verified in the field: Inspector : Date: Notes: zoning to complete the following: Viola, ns: Y/ ' If so, List: Pro Y/N If so; tst: Varian e: Y/ I f so, List: / ff, N o, List: Clearances: SDP's Revised 04/28/08, 10/13/09 Page 3 of 3 u 5 3a 9 oning Clearance Checklist Applicant MUST HAVE the following information to apply for a Zoning Clearance: 1) Tax Map and Parcel or Address, Building Name, Suite/Unit /Floor numbers, if applicable. .2)..A_Flo.or.P-_lan_-- either -a_ sketch= or_.an_architectural __drawing_____ a) If using less than the entire structure, note the location within the structure; b) Note the total square footage of the use; c) Note the square footage of each room or area of use; d) Note the use of each room or area of use. Conditions of Approval FIREWORKS: 1. No person shall sell, offer for sale, store, display or discharge any fireworks in any filling station or on any premises where gasoline or other inflammable liquids are stored or dispensed. (Code 1967 10 -13.) County Code Section 6 -200 and 6 -300 and must be a minimum of 100 ft from any gas pumps /propane distribution tank. 2. The site shall be cleaned and restored to its original condition on or before July 11th. This shall include removal of all structures, signs, debris, and the like. 3. A thirty (30) foot front setback shall be maintained, Display shall be located so as to avoid traffic congestion. Modifications subject to Zoning Administrator's approval. 4. Building permits shall be obtained for all proposed structures and /or lighting. 5. Sign permits shall be obtained for all proposed signage. 6. The sale of fireworks requires a special permit from Fire /Rescue department. CHRISTMAS TREES: 1. The outside storage of combustible material or flammable materials shall be located so as not to constitute a hazard and shall not be less than 15 feet from any building on the site. Any open burning must comply with the Virginia Statewide Fire Prevention Code and the Albemarle County Code. 2. The site shall be cleaned and restored to its original condition on or before January 2. This shall include the removal of all structures, signs, debris, and the like. 3. A thirty (30) foot front setback shall be maintained, Display shall be located so as to avoid traffic congestion. Modifications subject to Zoning Administrator's approval. 4. Building permits shall be obtained for all proposed structures and /or lighting. 5. Sign permits shall be obtained for all proposed signage. OTHER REVIEWS: 1. Is the property on public or private water /sewer? Private requires Health Department, Public requires ACSA review (2 to 5 days) 2. Will you be operating a bakery? USDA review is required (approx. 2 weeks but as long as 6 weeks) 3. If you are serving prepackaged baked goods but not making them on the Premises, only Health Department will review. (2 to 5 days) 4. If you will be operating any business that is in an industrially zoned district or of an industrial nature you will need to provide a Letter of Performance Standards or Certified Engineer's Report (a staff member will provide an information packet addressing this requirement) (5 to 10 days as soon as the Letter or Report is received by this Department) 5. If there has been no site inspection within the last three (3) months for the parcel /site, then one will be conducted to verify that the project is in compliance with an approved site plan (if applicable). Revised 04/28/08, 10/13/09 Page I of 3