Loading...
HomeMy WebLinkAboutWPO201000064 Review Comments Erosion Control Plan 2010-11-19ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Date received: Date of Comment: Engineer: WPO- 2010 - 00064, HTC Apartments ESC Plan Mr. Scott Collins, PE; Collins Engineering Uptown Village, LLC 6 October 2010 19 November 2010 Phil Custer The ESC plan for Hollymead Towncenter Apartments, received on 6 October 2010, has been reviewed. A review of the SWM and site plan will be provided at a later date. This ESC plan cannot be approved as submitted and will require the following corrections before approval can be granted: 1. Before this plan can be approved, the offsite easements on TMP 32 -50 must be recorded. These easements include a permanent stormwater facility easement, a permanent public sewer line easement, and temporary construction easement to install these facilities. 2. Before this plan can be approved, the offsite private drainage easement on TMP 32 -49K must be recorded. 3. The diversion through the middle of the construction site to reduce the drainage area to the east is impractical to maintain throughout the filling of the site. Please remove this diversion and accommodate the portion of site draining to the east in the existing condition. It appears that structure 6 can be designed as a sediment basin riser and the stormsewer system 5 -3 -1 can be built during Phase I. Sediment Basin 1 should remain as designed however, because the drainage area will likely increase during fill operations. 4. It is my understanding that an ESC plan was recently approved for filling of the south side of Towncenter Drive across from the apartment complex. In this plan, the construction of SB -2 was authorized. However, because the apartment complex plan is much larger, it will supersede the waste area plan for the sediment basin. At the time the bond is posted for the apartment complex plan, the applicant should request a bond reduction of the waste area plan for the basin. Also, please note in the construction sequence that Sediment Basin 2 should be constructed prior to commencement of Phase II. 5. The ESC measures proposed to protect Phase III construction (IP and SF) are not adequate for the watershed and the amount of work required in this phase on the north end of the site. I recommend breaking Phase III into two phases. In Phase IIIA, the parking lot and drainage structures north of the pool would be constructed. Below this work the sediment basin would be filled in and converted to a sediment trap sized for the upstream watershed. Once the drainage structures and curbing have been installed to direct the upstream construction area to S13-2, the rest of the work to finish the site can be performed using silt fence at the tree preservation line. 6. Please grade sediment basin 2 and the stormwater management facility in such a way that the Willow Glen Connector Road can be construction without impacts. 7. It is my understanding that the tree preservation areas are critical to the number of units proposed on this site plan. Please provide a tree survey for the location, size, and type on the eastern side of the property at the same scale as the plan. 8. Please fill as much as possible, ensuring positive drainage of the downhill diversion dikes, during Phase II in the areas east and west of Sediment Basin 1. Please also relocate the diversions on the east and west side of Sediment Basin 1 as close to the limits of disturbance as possible to ensure positive drainage. 9. A construction entrance is needed for Sediment Basin 2. 10. Please show outlet protection in Sediment Basin 2 where pipe 1 outlets into the facility. 11. Please round down when computing the diameter of the dewatering orifice. 12. Please update the county erosion and sediment control notes. These notes can be found in the latest edition of the design manual, available online. 13. The limits of clearing and grading do not appear to include Sediment Basin 2 and the sewer line construction. Please update the limits and check to make sure all proposed construction is shown within this line. 14. Please remove sediment trap 2. A trap cannot drain over a sidewalk and curb of a VDOT roadway. Runoff from the construction entrance will drain to a sediment trapping measure with both the existing and proposed contours so another trap is not needed. 15. Please provide a diversion dike along Towncenter Drive east of the eastern most entrance in phases I and lI. By Phase III, this slope should be stabilized. 16. Engineering offers the following comments regarding the adequate channel analysis: a. As stated throughout the plan, this project has a disturbed area of around 9 acres. The 1% rule along Powell's creek is reached when the watershed is 900acres. It does not appear that this is shown on sheet SWM -4. Please remove the note referencing the 1% rule. b. The headwater on the Towncenter Drive pipe is extraordinarily high for a 10 -year storm. Generally, a headwater of 1.5 x the diameter of the pipe for the 10 -year storm should be designed for culvert crossing. c. The slopes used in most of the computations appear to be underestimating the average slope of the segment of the stream. When I measured the distances between the county's 4ft contours I found slopes greater than 2% for most of Powell's Creek. 17. The ESC portion of the WPO bond will be computed at the time of plan approval. File: El_esc_PBC_WPO -2010 -00064 HTC Apartments ESC Plan.doc