Loading...
HomeMy WebLinkAboutSUB200600411 Review Comments Road Plan and Comps. 2010-10-284 �F ALg� , O � �'IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SUB - 2006 - 00411, Ashcroft Phase III, Road Plan WPO- 2007 - 00053, Ashcroft Phase III, SWM Plan Plan preparer: Neal Wright, PE Dominion Engineering & Design, LLC (fax.979.1681) Owner or rep.: Mr. Richard L. Beyer; Liberty Land LTD (fax.977.7219) Date received: 09 September 2010 Date of Comment: 28 October 2010 Engineer: Max Greene The SWM, and road plans for Ashcroft Phase III, received on 9 September 2010 has received Engineering review. The Road Plans appear to have adequately addressed the Road plan comments. • The applicant will need to submit a Subdivision Road Bond Estimate Request prior to final plat approval. This request needs to be completed by the applicant before a road bond can be computed. The road bond needs to be posted and approved before the Engineering Department will grant approval to the final subdivision plat. The following SWM comments appear to remain outstanding: 1. Please provide a SWM facility maintenance agreement and fee for recordation. (Rev. 2) Comment remains unchanged. An agreement is needed for parcels 78A -03 F, 78A -1, and 78A -1A. (Rev. 3) SWM facility maintenance agreements and fees have not been received. (Rev. 5) Remains unaddressed. Please note SWM's FMA is for County file # WP0200700053. 2. (Rev. 2) Please provide a permanent baffle in SWM -1 for the concentrated discharge inlet point located adjacent to the spillway. (Rev. 3) The baffle is not long enough. It must be at least 100ft. (Rev. 5) Baffle scales @ 20' and has not adequately addressed the comment. Please review details and requirements of baffle geometry on pages 3.06 -12 to 3.06 -15 of the Virginia Stormwater Management Handbook, Volume I A completed copy of the Standard Stormwater Maintenance Agreement and fee for recordation for the stormwater facilities is required prior to final approval. [ 17 -304E] The forms and instructions can be found on the Community Development Department Web site on www.albemarle.oriz . You may contact Ana Kilmer (Albemarle County Department of Community Development) at Albemarle County Community Development Engineering Review Comments Sheet 2 of 2 ext. 3246 for further information on Maintenance Agreements. • Just a reminder, DCR is enforcing the VSMP General Permit Registration Statement. Please contact DCR, at 804.225.3068 for more information. This does not affect your review /approval of this plan. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene@albemarle.org to schedule an appointment. Water Protection Bond amounts will be generated upon final plan approvals. File: E5_swm, rp_ PBC_GEB_MRG Ashcroft Phase III.docx