Loading...
HomeMy WebLinkAboutSUB201000122 Review Comments Final Plat 2010-10-21*-&A County of Albemarle Department of Community Development Project: Block 3B Lot 1 Subdivision; Old Trail Village Center (SUB -2010- 00122) Plan preparer: Mr. Kirk Hughes, L.S.; Kirk Hughes and Associates Owner or rep.: Craig Enterprises, Inc. Date received: (Rev. 1) 20 October 2010 14 September 2010 Date of Comment: (Rev. 1) 21 October 2010 6 October 2010 Engineer: Phil Custer The first revision to the final plat for Old Trail Block 3B Lot 1 Subdivision, received via email on 20 October 2010, has been reviewed. Engineering review for current development can recommend approval to the plat once the following comments have been addressed. 1. During the review of the revision to the last Old Trail Block 3B subdivision plat (SUB -2010- 00096) it was discovered that Claremont Dr. from Station 13 +50 to 17 +25 is not currently covered by any road bond nor has it been accepted by VDOT for maintenance. The issue was not raised to expedite the previous application. However, before this plat is approved, the bond for the remaining portion of the road must be posted. It does not appear that an estimate has been computed and the applicant must request that one be calculated by completing this form and providing it to the county with a $250 fee. This portion of Claremont appears to have been reviewed and approved under SDP - 2008 - 00035. [14- 303.E, 14 -435] (Rev. 1) Comment has not been addressed. 2. The plat appears to need more easements regarding the water and sewer services to Lots 1, 2, and 3. Easements appear to be needed for the following utility lines: a. The private sanitary sewer lateral for lot 1 across lots 2 and 3. b. The private sanitary sewer lateral for lot 2 across lot 3. c. The water meters for lots 2 and 3. (public) d. A private water lateral to lot 1 across lots 13 and 2. [14- 303.L] (Rev. 1) All of the required easements have been provided, but Lot 13 must now be party to the plat because of the new easements being proposed on that parcel. 3. The latest site plan amendment appears to have added a private roofdrain system across Lots 1 -7. This system must be contained within a private easement to the storm sewer structure 3 -14. This easement does not need to be the standard 20ft wide. [14- 303.L] (Rev. 1) Comment has been addressed. 4. An access and maintenance easement is needed on lot 7 to allow for public access to the grassed lawn. This easement should be extended to the property line, not just to the alley /private street easement, and may need a maintenance agreement as well. [14- 303.E] (Rev. 1) Comment has been addressed. Megan has informed me that a maintenance agreement is not needed for this sidewalk. 5. For Old Trail Drive and Claremont Drive, please provide the deedbook and page number that each ROW was dedicated with. [14 -428] (Rev. 1) Comment has not been addressed. File: E2_fpt_PBC_sub201000122.doc