Project:
Lockwood Townhomes Phase I Final Before Preliminary Site Plan
SDP - 2010 -00086
Plan preparer:
Mr. Scott Collins, PE; Collins Engineering
Owner or rep.:
Route 29, LLC
Plan received date:
25 October 2010
Date of comments:
17 November 2010
Reviewer:
Phil Custer
The final- before - preliminary site plan, submitted 25 October 2010, has been received and reviewed by
Engineering. A review of the WPO plan will be transmitted in a separate document. Engineering review
provides the following comments on the final site plan:
1. The Zoning and Planning departments must determine whether the site plan is consistent with the
approved rezoning plan. Engineering review has identified a few areas of the site that do not
match the approved application plan:
a. The width of the park has been considerably reduced from the application plan to 75ft in
the current site plan. Page 15 of the approved Code of Development states this park is to
be 41,600 sf. Given the constructed distance of Lockwood Drive and Meeting Street of
326ft, a park with a 128ft width is needed to achieve the area specified in the COD. The
COD also states this area is to be flat for active recreation. When constructed, the park
should be graded at a consistent 5% slope from Meeting Street to Lockwood Drive and no
more than a 2% cross slope.
b. Community Street appeared to be intended as a street with planting strips. The planting
strips have been removed.
c. Page 19 of the Code of Development states "additional stormwater facilities will be
implemented as each site is developed and shall be subject to the approval of Albemarle
County Engineering Department. Page 37 also states the "design shall work to provide
smaller dispersed biofilters and rain gardens in order to increase the functionality of the
larger detention ponds." I do not see any facility within this plan other than the regional
facility south of Alders Gate Way.
2. Proffer 3 requires two public transit stops to be designed and constructed. The locations of these
two stops must be approved by the Director of the Planning Department prior to site plan approval.
The design of the transit stops will be subject to the review of the county and VDOT when the
adjacent area is constructed.
3. Proffer 5 requires that the greenway be dedicated in fee simple to the county. This must be
dedicated (and bonded if construction is not completed) prior to the approval of this site plan. The
greenway cannot be dedicated until the construction plans for it are approved by the county.
4. The site plan cannot be approved until the WPO plan is approved. The review of the WPO plan
will be provided in a separate comment letter.
5. It does not seem that it was explicitly stated during the original rezoning whether Community
Street would a public or private. In either case, this street must be designed using public street
standards. Please use the VDOT standard GS -SSR for the road geometrics. This road will also
require the standard curb and gutter, sidewalk, and planting strip requirements of the Subdivision
Albemarle County Community Development
Engineering Review Comments
Page 2 of 3
Ordinance unless waived by the Planning Commission. I'll note now that Section 14 -234 states
the agent cannot authorize a private street that connects two public streets. When the plat is
submitted to create the private street, approval from the Planning Commission may be needed. [18-
32.7.3]
6. The subdivision ordinance requires all streets (both public and private) to provide planting strips,
sidewalk, and curb and gutter. I do not believe the travelway behind the lots in the current site
plan needs to be approved as a private street in order to subdivide because frontage is currently
provided by Lockwood Drive. However, when future plans are submitted for the residue, this
alley will need to be called a private street to provide frontage for later townhome lots. At that
time, a waiver must be approved by the Planning Commission because the ordinance doesn't
exempt developments with approved rezoning applications.
7. Please provide the Deedbook and Page Number for the recordation of Community Street west of
development. The site plan is inconsistent in labeling this roadway regarding whether it is
publicly or privately maintained.
8. The travelways( "alleys ") must be 20ft in width. The applicant has the option of requesting a
waiver to the Chief of Current Development per 18- 4.12.2. [18- 4.12.17]
9. Curbing is required on the travelways( "alleys ") shown on this plan. The applicant has the option
of requesting a waiver to the Chief of Current Development per 18- 4.12.2. [18- 4.12.15]
10. Please provide street trees in the planting strip along Lockwood Drive. The Code of Development
requires these trees to be placed an average of 40ft on center and 2in. caliber.
11. Please update the General County Notes for Street Construction and move the notes away from the
binding.
12. Please note that Community Street will need to be constructed to Meeting Street once the
development of Cl, C3, and C4 totals 50 units. [18- 32.7.2]
13. Please place the centerline of Community Street in the center of the roadway on the crown. Will a
horizontal curve be needed to line up the two entrances onto Lockwood and Meeting? Please also
place the centerlines on the grading sheet.
14. The centerline for the alley is not shown on the site plan. A profile of the alley is not needed
unless the standard approved by the agent during the subdivision plat requires a profile.
15. With the current proposed vertical alignment of the alley, it appears that structure 10 will miss
most of the water intended for it. The grate structure should be relocated to the low point of the
alley profile.
16. Please end the vertical curve before the entrance onto Meeting Street (Sta. 13 +50).
17. Please provide full buildout ADT projections for the alleys (private streets after future
development) and the segment of Community Street between Lockwood Drive and Meeting Street.
For the Community Street projection, please consider the connection through D1 and D2 to be
built. Community Street through C1, C3, and C4 will be a convenient connection between the
residences to the west and the businesses along Route 29. [18- 4.12.15.c]
18. The paving calculations and details should be updated based on the full buildout ADTs required
above. [ 18- 4.12.15.c]
19. Please extend the sidewalk to the northern edge of the rezoning. [18- 32.7.2]
20. Sight distance easements are needed on the corners of lots 19 and 20 with the current geometry.
21. I am unfamiliar with the use of DI -5's in travelways. The Road and Bridge Standards state that
DI -5 should be used in areas not normally subjected to traffic. Is there a revised detail for this
structure that has a different grate that can be subject to traffic loads?
22. The table in the upper right corner of DP -5 is not correct because it assumes each inlet is placed in
a sump condition. The discharge into this structure is similar to a DI -313 on -grade where a
percentage of the water is flowing at the edges of the "spread" and bypasses the structure. How is
the amount of bypass flow pass around the DI -5 structure determined? A DI -12 structure might be
Albemarle County Community Development
Engineering Review Comments
Page 3 of 3
more suitable.
23. Pipe sizing calculations should updated assuming the full buildout condition (tc, areas, and Q to
avoid issues in the future.
24. It is county engineering policy to limit the amount of concentrated discharge in travelways to be
less than lcfs for safety purposes. The current calculations for the drainage system in the alley
appear to adhere to this policy, but in the future it is inevitable that the drainage areas and
discharges will be significantly increased when C1 and C4 are developed. Please increase the
frequency of the grate inlets using reasonable future watershed estimations.
25. The time of concentration differs between sheets DP -1 and SWM -2. For drainage system
calculations, please assume a time of concentration for full development.