Loading...
HomeMy WebLinkAboutARB201000121 Staff Report Final Site Plan and Comps. 2010-11-29ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB- 2010 -121: Avinity Final Site Development Plan Review Type Final Review of a Site Development Plan Parcel Identification Tax Map 91, Parcels 14, 35I, 35J, 35K Location 1785 Avon Street Extended, on the east side of Avon Street Extended, just south of Cale Elementary School Zoned Planned Residential Development (PRD), Entrance Corridor (EC) Owner /Applicant Avon Properties LLC, Collins Engineering (Scott Collins) Magisterial District Scottsville Proposal To construct a residential development consisting of 100 townhouses, a multi -story 24 unit condominium building, clubhouse and associated site improvements on a 9.24 acre parcel. Context The proposed development is located on the Avon Street Extended (State Route 742) Entrance Corridor. This corridor is moderately dense in development and is characterized by a mix of single family, multi - family, commercial and light industrial uses. Visibility The proposed development is located on a parcel approximately 1,000' deep on the east side of the Corridor. Development is proposed in 4 phases. The front and side elevations of Units 1 - 10 and the front and west elevations of 19 -26 are expected to be highly visible due to their close proximity to the Corridor. Views of the clubhouse are expected to be limited to the roof. Views of other townhouses are expected to be limited to general shapes, colors and forms. The condominium building at the back of the property is not expected to be visible. ARB Meeting Date December 6, 2010 Staff Contact Margaret Maliszewski Protect History DATE APPLICATION/REVIEW TYPE RESULT 10/4/10 ARB 2010 -87: Preliminary review completed Comments provided (see Attachment B) 9/9/10 SDP 2010 -72: Final Site Development Plan received in Current Development Under review 5/27/10 SDP 2010 -24: Preliminary Site Development Plan Approved 3/26/10 Variation Request (SDP 2010 -24, ZMA 2006 -5) Approved 6/25/07 SDP 2007 -66: Final Site Development Plan Withdrawn 6/13/07 ZMA 2006 -5: Rezoning request Approved 4/9/07 ARB 2007 -11: Advisory Review for a Rezoning No objection, w/ conditions Changes since the last review: The townhouse units 19 -26 have been turned so that the fronts now face the entry drive. The EC trees have been shifted into the VDOT right -of -way. The fence at the west end of the north side of the property has been shifted to allow for planting. ANALYSIS REF ARB COMMENT from OCTOBER 4 ISSUE RECOMMENDATION 1 Revise the proposal by showing three 8 colors are proposed for the HardiPlank Revise the Unit A elevation sheet to different, but complimentary, paint colors siding and 3 colors are proposed for the roof eliminate the reference to Lawrenceville for Units 1 -26. shingles. (See Attachment A for a list of "Monticello" brick. colors.) The siding colors are somewhat light, mostly neutral tones. The shingle colors are varying shades of gray and black, with the "Charcoal" sample on the dark side. The applicant's memo indicates that a variety of colors will be provided within each townhouse grouping. The colors are expected to have an appropriate appearance. The Unit A elevation calls out Lawrenceville "Monticello" brick. The materials schedule calls out Old Virginia "Poplar Forest ". 5 Revise the three bays of the fagade of the The central bay of the front elevation has None. clubhouse elevation to be more been increased in height. The site section appropriately scaled to each other. indicates that only the upper part of the clubhouse, primarily the roof, will be visible. Consequently, the relationship among the various bays on the front elevation will be difficult to discern from the EC. 7 Include a note on the site and The note was added to the site plan but not Include a note on the architectural plans architectural plans that mechanical the architectural plans. that mechanical equipment shall not be equipment shall not be visible from the visible from the EC. EC. 11 Show evidence that the maple trees along The applicant has moved the Red Maples None. the EC frontage would be permitted, into the VDOT right -of -way. In the past the undisturbed, within the overhead utility ARB has typically required all landscaping easement or provide an alternate species to be provided on site. However, the and/or location that would meet the Neighborhood Model recommends trees requirements of an EC frontage tree. between the sidewalk and the back of the 2 REF ARB COMMENT from OCTOBER 4 ISSUE RECOMMENDATION curb. This proposal meets that county goal 11 Revise the landscape proposal by flex crenata "compacta" holly are proposed Check the planting size of the Ilex crenata showing flowering ornamental trees in a row along the sidewalk in front of units "compacta" and revise the Planting interspersed among the Red Maple 1 — 10. The holly are proposed at 4 -5' tall at schedule to provide a reasonable height at frontage trees and shrubs, 24" tall at planting, but the plant's mature height is planting, no less than 24 ". planting, integrating Units 1 -10 with the about 5 -6' tall, so the planting size seems to overall landscape plan, mitigating the be a mistake. A minimum height of 24" at appearance of their length as viewed planting would be sufficient. from the corridor. SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The proposed siding colors. Staff offers the following comments on the Preliminary Site Plan: 1. Revise the Unit A elevation sheet to eliminate the reference to Lawrenceville "Monticello" brick. 2. Include a note on the architectural plans that mechanical equipment shall not be visible from the EC. 3. Check the planting size of the Ilex crenata "compacta" and revise the Planting schedule to provide a reasonable height at planting, no less than 24 ". 3 ATTACHMENT A This report is based on the following submittal items: Sheet # Drawing Drawing Date/Revision Date 1 Title Sheet Revision date 10/25/10 2 Existing Conditions and Limits Plan Revision date 10/25/10 3 Site Plan Revision date 10/25/10 4 Grading & Stormwater Management Revision date 10/25/10 5 Landscaping 8/30/10 6 Landscaping Details Revision date 8/23/10 7 Site Sections No date 8 Elevations, Unit Type A Revision date 10/25/10 9 Building Plans, Unit Type A Revision date 10/25/10 10 Elevations, Unit Type B Revision date 10/25/10 11 Building Plans, Unit Type B Revision date 10/25/10 Product Brochures Shingle samples: GAF Timberline Natural Shadow in Charcoal, Pewter Gray and Slate HardiePlank samples: Heathered Moss, Khaki Brown, Sail Cloth, Arctic White, Light Mist, cobble Stone, Woodland Cream, Timber Bark, Woodstock Brown ATTACHMENT B COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 3, 2010 Scott Collins Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: ARB- 2010 -87: Avinity Preliminary Site Plan Dear Scott, The Albemarle County Architectural Review Board, at its meeting on October 4, 2010, completed a preliminary review of the above -noted request to construct a residential development consisting of 100 townhouses, a multi -story 24 unit condominium building, clubhouse and associated site improvements on a 9.24 acre parcel. The Board offered the following comments for the benefit of the applicant's next submittal. Please note that the following comments are those that have been identified at this time. Additional comments may be added or eliminated based on further review and changes to the plan. 1. Revise the configuration and size of the building footprints for Units 1 - 10 so they match the elevations submitted. Revise the proposal by showing three different, but complimentary, paint colors for Units 1 - 26. Revise the building Type A elevations by labeling for proposed materials and colors. Provide rear elevations of Units 19 - 26 that correspond with the building footprint. 2. Consider distinguishing the scale of architectural expression on Units 1 -10 and 19 -26 from the residential units throughout the remainder of the development. 3. Revise the design of the rear elevations of Units 19 - 26 to appear more as if they front on the entrance road (Avinity Drive). This could be accomplished with the addition of gable roof forms, variation in the size and placement of windows, and variation in the porch designs. Flipping the elevations to have the front door facing the entrance road is one acceptable approach. 4. Provide for review the side northwest elevations of Units 39, 69 and 57, labeled for materials and colors. 5. Revise the clubhouse elevation by labeling for proposed materials and colors. Provide a sample of the General Shale Virginia Highlands brick proposed for this building. Revise the three bays of the fagade to be more appropriately scaled to each other. 6. Provide sketch elevations of the 24 unit condominium building with material /color selections showing general building /roof forms. 7. Include a note on the site and architectural plans that mechanical equipment shall not be visible from the Entrance Corridor. 5 8. Revise all applicable drawings to show the location and method of concealment for all mechanical equipment proposed for Units 1 - 10, 19 - 26 and the clubhouse. 9. Revise all applicable drawings to accurately show the fence location. Provide a detail of the proposed privacy fence including materials proposed, method of construction and proposed colors; wood materials with dark earth tone colors of brown and grey would be acceptable. 10. Shift the location of the 342' length of fence proposed between Phase 2 and Cale Elementary a minimum of 6' inside the property line to allow for plantings between the fence and the boundary. Revise the landscape plan to show plantings in intermittent masses on the north side of the fence next to Cale Elementary, south side of the fence adjacent to Unit 1. 11. Revise the Planting Schedule to show a 3' /z" caliper for the proposed Red Maple EC frontage trees. Provide evidence that these trees would be permitted, undisturbed, within the overhead utility easement or provide an alternate species and /or location that would meet the requirements of an EC frontage tree. Revise the landscape proposal by showing flowering ornamental trees interspersed amongst the Red Maple frontage trees and shrubs, 24" tall at planting, integrating Units 1 - 10 with the overall landscape plan, mitigating the appearance of their length as viewed from the Corridor. Revise Sheet 5 Landscaping Plan by removing the hard surface area mistakenly shown in the front yards of Units 1 - 5 and include the following note: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height, the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 12. Revise Sheet 5 Landscaping Plan by reducing the spacing of proposed trees along interior roads ( Avinity Loop and Avinity Court) so as not to exceed 40'. 13. Revise Sheet 4 Grading & Drainage Plan so that all proposed cut and fill slopes along the north and south side parcel boundaries are rounded to a minimum 10' radius to meet the adjacent site. 14. Revise Sheet 4 Grading & Drainage Plan to show the location of proposed (revised) tree lines along the northern (side) parcel boundary; include the location and method of tree protection proposed. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on -line at www.albemarle.org /planning. Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing and an ARB approval signature panel. Please provide a memo including detailed responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Brent W. Nelson Landscape Planner cc: ARB- 2010 -87 Avon Properties LLC, PO Box 1467, Charlottesville, VA 22902 Gerald Gatobu, Current Development 0