HomeMy WebLinkAboutWPO201000073 Review Comments Erosion Control Plan 2010-12-09ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2010 - 00073, Great Escapes Movie Theater at Hollymead Town Center Plan preparer: Mr. Scott Collins, PE; Collins Engineering Owner or rep.: Route 29 LLC Date received: 25 October 2010 Date of Comment: 9 December 2010 Engineer: Phil Custer The ESC plan for Great Escapes Movie Theater at Hollymead Town Center, received on 25 October 2010, has been reviewed. Comments from the review of the site plan submittal have been provided in a separate comment letter. The comment letter for the SWM plan will be transmitted at a later date. The ESC plan can be approved after the following corrections are made: 1. Proffer 913 states that the owner shall provide additional erosion and sediment controls to achieve a sediment removal rate of 80%. I cannot find anywhere in the plan where measures above and beyond the minimum requirements have been provided. On the next submittal, please add these additional measures and provide a list on sheet 18 which the Program Authority can review for compliance with the proffer. 2. The timing of the construction of the retaining walls is critical to the adequacy of this ESC plan. The retaining wall must be built as the first step in Phase II. As the retaining wall is built, the contractor must maintain a diversion directing water to sediment basin 1, and eventually 2. At the end of step 6 of the construction sequence, state that the retaining walls must be constructed in a matter that directs runoff to the south into sediment basin 1, and eventually 2. The diversion shown on Phase I that is north of sediment basin 1 cannot be disrupted until the ESC inspector is satisfied that the diversion (or pipe system) above the retaining wall is adequate to convey the necessary runoff. 3. Please provide more information in the construction sequence regarding the modification and removal of sediment basin 1. Phases I and 11 are snapshots of the construction process that represent two days of the total timeline. I am concerned that during intermediate phases there will not be adequate protection as the basin is filled and structure is modified. 4. Please include the regrading of sediment basin #2 (and 1 if necessary) in step 4 of the construction sequence. 5. The purpose written in the ESC narrative appears to be referencing a mass grading plan rather than a site specific ESC plan. 6. Please include the greenway and all associated grading within the limits of construction for the project. Please provide ESC measures as necessary to achieve the grading as required by the trail standard. Please update the total amount of disturbance stated in the ESC narrative accordingly. 7. Please state how the greenway trail west of Powell's Creek will be constructed and provide appropriate ESC measures. 8. Please show the limits of the previously approved ESC plan for the adjacent Hollymead Al development. The WPO plan referenced by the applicant (WPO- 2008 - 00086) does not include the construction Meeting Streeet within its limits. Please remove any reference to this claim in the plan. The Great Escapes ESC plan should expand its limits to include the Meeting Street construction because this roadway is necessary for the Great Escapes site plan. The road plan within the ESC plan must match the plan submitted for review under SUB - 2010 -00141 including the location of all inlets and pipes. It is my understanding that the ESC basin south of the Kohls building was sized to include a portion of this segment of Meeting Street, despite the fact that it wasn't proposed for construction at that time. 9. In sheet 19, please show a diversion south of sediment basin #2 to the end of the limits of construction for this plan. 10. When Sta. 17 +00 to Sta. 18 +75 of Meeting Street is constructed (either in sheet 20 or 21), show a fill diversion along the slope and silt fence below it. 11. Please label the drainage areas on sheet 19 as it was done on sheets 20 and 21. The drainage area to SB #2 will increase based on the above comments. 12. Please show the calculations table /detail for existing sediment basin 1 and make sure the facility is adequate for the drainage area to it during Phase I. 13. The drainage area to sediment basin 2 should essentially be equal to the post - development drainage area shown on sheet 24, including any additional runoff from Meeting Street. Please update the calculations accordingly. 14. The time of concentration of 14 for sediment basin 2 appears to be too long, especially considering that the pre - development rate was 11 minutes. Please update the calculations accordingly. 15. The diversions shown in Phase H in the middle of construction will be too difficult to maintain during day to day operations as the site is regraded. Please remove the northwesternmost diversion and update the sediment basin drainage areas. 16. Please identify the greenway trail, especially the stream crossing, as a critical area on the plan. Please also identify the filling of the roadway close to Powell's Creek as being a critical erosion area. 17. Please remove step 13 from the construction sequence and related notes on sheets 19, 20, and 21 since this is the final plan and all final stormwater measures will be bonded when this plan is enacted. 18. Please show outlet protection (OP) at all drainage system outfalls. 19. Please provide dewatering orifice calculations for all sediment basins. My calculations show that smaller orifices are required. 20. In sediment basin #2, please move the baffle 15ft to the south and extend to the 497 elevation south of the diversion from Meeting Street. 21. In the phase II version of sediment basin #1, please rotate the baffle about 15 degrees counter- clockwise so the baffle is between the end of the diversion and the sediment basin riser. 22. Please update the standard county ESC construction notes with the latest version found in the design manual. 23. Please provide a detail for sediment basin 1's barrel through the proposed retaining wall. Is this pipe to be removed after basin 1 is no longer necessary? 24. In both the construction sequence and the project description of the ESC narrative, please state that permanent seeding will be applied to all disturbed areas, except for areas the Program Authority determines are otherwise permanently stabilized or are under construction with an approved building permit. [Proffer 9C] 25. Engineering review has the following comments regarding the MS -19 analysis: a. The project area used to compute the total drainage area for the 1% rule is the total development, not subphase. In the case of the Great Escapes and Lockwood Townhome ESC plans, the project area includes all other areas of the A2 rezoning plan. The analysis provided does not appear to have reached the I% rule. b. The slopes used in most of the computations appear to be underestimating the average slope of the segment of the stream. When I measured the distances between the county's 4ft contours I found slopes greater than 2% for most of Powell's Creek. c. The analysis studies just one channel downstream of the Great Escape Stormwater facility. Please provide three more cross - sections between the Route 29 culvert and the outlet of the Great Escapes Basin. d. Please analyze a section at the greenway trail crossing. The bridge should be able to pass the 10 -year storm without washout. 26. An ESC bond will be computed at the time of WPO plan approval. File: El_esc_PBC _ wpo- 2010 -00073 Great Escapes Movie Theater.doc