Loading...
HomeMy WebLinkAboutWPO201000071 Review Comments Erosion Control Plan 2010-12-09� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: National College — Off Site Utility [WP020100007I] Plan preparer: Craig Kotarski [craig.kotarski @timmons.com] Owner or rep.: Corolla Management Corporation Plan received date: 25 October 2010 Date of comments: 9 December 2010 Reviewer: John P. Diez — Current Development - Engineering Technician A. Erosion & Sediment Control plan (WP0201000071) 1. Will this project be going on at the same time as National College? If so, please show existing construction entrance and E &S measures from that project (National College - WP0201000070). Otherwise, a construction entrance must be provided. Engineering recommends to hold a meeting with the E &S inspector to go over possible solutions. 2. A temporary construction easement from TMP's 32 -2213, B1, 132, & 32 -6A must be recorded prior to plan approval. 3. All erosion and sediment control measures must be within the limits of disturbance. 4. Please provide an updated County E &S Notes. Please refer to the Design Standards Manual. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact John Diez at 434 - 296 -5832 or jdiez @albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: jdiez @ albemarle.or,a. \\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000071 - National College Off -Site Utility \CDEl- esc_JPD_National College - Off Site Utility.doc