Loading...
HomeMy WebLinkAboutWPO201000066 Review Comments Erosion Control Plan 2010-11-03OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Date of comments: Reviewer: Moores Creek Pump Station Improvements— WP0201000066 Matthew D. Buswell, P.E. [mbuswell @ hazenandsawyer. com] Rivanna Water & Sewer Authority Moore Creek 18 October 2010 3 November 2010 John P. Diez — Engineering Technician A. Erosion and Sediment Control Plan 1. All erosion and sediment control measures must be within the limits of disturbance. This includes the construction staging and stockpile area. Please revise. 2. Please provide details for the turbidity curtain. Please refer to the Virginia Erosion and Sediment Control Handbook, section 3.27. 3. Please provide a Utility Stream Crossing (USC) on Moores Creek. Please refer to the Virginia Erosion and Sediment Control Handbook, section 3.25. 4. Army Corp permit approval is required for final E &S approval. 5. Please provide a construction sequence. \\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000066 - Moores Creek Pump Station Improvement \CDEl_esc_JPD_Moores Creek Pump Station Improvements. doc