Loading...
HomeMy WebLinkAboutWPO201000052 Review Comments Bond Estimate 2010-11-02BOND ESTIMATE - EROSION CONTROL PROJECT NAME: MOORES CREEK NUTRIENT REMOVAL IMPROVEMENTS PROJECT NUMBER: WPO201000052 DATE OF ESTIMATE: 10/21/10 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.2 $1,500.00 $3,300.00 SILT FENCE LF 1309 $5.00 $6,545.00 TREE PROTECTION LF 0 $5.00 $0.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 0 $3.00 $0.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0 $1,000.00 $0.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 0 $500.00 $0.00 INLET PROTECTION EA 22 $200.00 $4,400.00 OUTLET PROTECTION EA 2 $200.00 $400.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 16645.00 PROJECT MANAGEMENT LS 15% 2496.75 TOTAL 19141.75 PROJECT ADMINISTRATION 10% 1914.175 BOND AMOUNT REQUIRED jj 21100.00 readsheet last revised:3 -10 -10