HomeMy WebLinkAboutSP201000036 Review Comments Special Use Permit 2010-11-08*—&A
County of Albemarle
Department of Community Development
Memorandum
To: Scott Clark, Senior Planner
From: Glenn Brooks, County Engineer
Date: 8 Nov 2010
Subject: Monticello United Soccer Club fill in the floodplain for fields and parking (SP201000036)
The SP for fill in the floodplain is recommended for approval with the following conditions;
1. A FEMA map revision must be obtained prior to site plan approval.
2. Fill shall only be for the entrance relocation as indicated on the plan.
It is not anticipated that the fill proposed will have any impact on the floodplain of the Rivanna River or on
adjacent properties. It is understood that there will be no structures, and grading for fields and parking will
be leveling only, with no fill in the floodplain.
If this special use permit were not accompanied by the special use permit for the use, it could be taken to
the Planning Commission and Board immediately. However, as time permits, the applicant may want to
clarify a few points before public hearing; (A) The plan could show conceptual stormwater management
and mitigation to meet the requirements of the Water Protection Ordinance, both of which will be required.
(B) Turn lane warrants on Polo Grounds road could be analyzed.
h1c: EI_sp_GGB_MonU.doc