Loading...
HomeMy WebLinkAboutSDP201000035 Review Comments Miscellaneous Submittal 2010-11-045 P i°--`�7 A9 -- 5� 1� v z COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 GREGORY A. WHIRLEY COMMISSIONER November 4, 2010 Mr. Glenn Brooks, P.E. Albemarle County Engineer Community Development 401 McIntire Road North Wing Charlottesville, VA 22902 Subject: West Village Chapter 527 TIA Dear Mr. Brooks, In accordance with § 15.2- 2222.1 of the Code of Virginia and the Virginia Traffic Impact Analysis Regulations, 24 VAC 30 -155, a traffic impact analysis was prepared by Renaissance Planning on the site plan for the proposed development project entitled West Village by WaterStreet Studio. We have evaluated this traffic impact analysis and prepared a report that summarizes the key findings and conclusions of the analysis. Our report is attached to assist the county in their decision making process regarding the proposed development. I am available at your convenience to meet and discuss VDOT's finding if you need assistance. And finally, I ask that you include VDOT's key findings of the traffic analysis in the official public records on the proposed project and have this letter, our report, and the traffic impact analysis placed in the case file for this site plan. VDOT will make these documents available to the general public through various methods including posting them on VDOT's website. Sincerely, Joel DeNunzio Land Use Engineer Cc: William Wuensch P.E., P.T.O.E. WE KEEP VIRGINIA MOVING Key Findings for Traffic Impact Analysis entitled West Village, Crozet VA Albemarle County, VA Project ID: SDP - 2010 -00035 Prepared by Renaissance Planning Group for WaterStreet Studio Below are VDOT's key findings for the TIA on the above project: Errors and Omissions • The study did not provide left turn. warrants for the Jarmans Gap Road and Blue Ridge Avenue intersection for the 2020 build scenario. It does not appear that the warrants will be met but they should be included in the report. • Figure 5 should indicate.which percentage is either Am or PM. Summary of Data • With the minor changes in the Errors and Omissions section of this report, the study results are acceptable and meet the regulatory requirements. Study Recommendation • The interconnection discussed at the end of the report does not include an analysis that addresses any improvements that may be needed with future development to the intersection at Blue Ridge Ave and Jarmans Gap Road. The county may want the study to include the future growth analysis. Other Items • The site plan should comply with the.Crozet Master Plan. The connector road should be shown on a larger aerial photo with the interconnection shown to ensure it will work for future development.