December 30, 2010
Mike Leo
56 Misty Mountain Road
Greenwood, VA 22943
RE: SP201000048, Music Festival
Dear Mr. Leo:
Thank you for your recent application for an extension of a special use permit to allow a music festival at
the Misty Mountain Camp Resort. The members of the County's Site Review Committee have reviewed
the development proposal referenced above and comments are included below.
Planning Division
No objection.
Health Department
The Health Department has no issues with the event, but the applicant needs to contact the Health
Department at least 14 days prior to the event in order to process the Coordinator's Checklist, to ensure that
the vendors are licensed and the bathroom facilities are adequate.
Division of Zoning and Current Development
Conditions of SP2009 -016 should be continued, except that the time limit should be extended for the five
years through June, 2016 as requested.
Baseline sound measurements obtained in October 2009 showed the sound levels to be in compliance with
the conditions for SP2009 -16. No complaints have been received during the two year trial period for the
event in 2009 and 2010.
County Engineer
No objection.
Building Inspection
No objection.
Architectural Review Board
The five year extension is not expected to have a negative impact on the Entrance Corridor.
SP 2010 -048, Music Festival
Virginia Department of Transportation
No objection.
2
Fire and Rescue Division
The festival must comply with the Virginia Statewide Fire Prevention Code. Approval is subject to a field
inspection and verification.
Comments from each reviewer reflect information available at the time the development proposal was
reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify
all issues which could effect approval of the proposed project.
If we have not received a response from you within 30 days, we will contact you again. At that time, you
will be given 10 days to do one of the following: a) request withdrawal of your application, b) request
deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c)
request indefinite deferral and state your justification for requesting deferral. If none of these actions is
taken, staff will schedule your application for a public hearing based on the information provided with
your latest submittal which was made according to the review schedule.
If you need additional information or need to discuss any of these comments, please give me a call at
434/296 -5832 x 3029. A copy of the schedule for re- submittal of plans /information/materials is enclosed,
for your convenience. All applications, including review comments, also can be found at the following
link: http: / /countyviewweb.albemarle.or.g . Please include a letter indicating how all the Site Review
Committee comments have been addressed.
Sincerely,
Eryn Brennan
Senior Planner
Cc: File