The Albemarle County Planning Commission held a public hearing on Tuesday, November 28,
2023, at 6:00 p.m.
Members attending were: Corey Clayborne, Chair; Fred Missel, Vice-Chair; Julian Bivins; Luis
Carrazana; and Lonnie Murray.
Members absent: Karen Firehock
Other officials present were: Kevin McDermott, Director of Planning; Andy Herrick, County
Attorney’s Office; Rebecca Ragsdale; Andy Reitelbach; and Carolyn Shaffer, Clerk to the
Planning Commission.
Call to Order and Establish Quorum
Ms. Shaffer called the roll.
Mr. Clayborne established a quorum.
Other Matters Not Listed on the Agenda from the Public
There were none.
Consent Agenda
There were no items on the Consent Agenda.
Public Hearing
ZMA202300008 High School Center II at Albemarle High School
Rebecca Ragsdale, Planning Division, said that this proposal concerned a rezoning at Albemarle
High School, also known as the Lambs Lane campus due to its multiple facilities. She said that
the total area was 216 acres; however, they were focusing on a 9.9-acre section at the front of
the property along Hydraulic Road where the rezoning was proposed. She said that this area was
an already developed part of the site and was located in the rural areas but near the boundary
with the development zone.
Ms. Ragsdale said that surrounding uses included residential, commercial, institutional, and
industrial, such as churches and the Loaves & Fishes food pantry on Lambs Lane. She said that
the entire property was zoned as rural areas, with some legacy zoning, including Georgetown
Green designated R6 and some industrial zones in the rural areas and across the boundary line.
She said that in the development area, there was a mix of residential and commercial zoning
districts.
Ms. Ragsdale said that the proposal aimed to rezone from a rural area to R10. She said that the
land use plan was encompassed by the rural area without any specific land use designations.
She said that it was adjacent to the Route 29 development area, which featured residential
designations and a neighborhood center designation. She said that focusing on the front of the
site, the proposal intended to provide flexibility for setbacks and building height for the new high
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
2
school center as well. She said that it was anticipated that this area may also be developed,
resulting in a significant amount of work ahead.
Ms. Ragsdale said that areas where there existed an existing parking lot had been discussed
extensively with schools. She said that there were no other special exceptions or modifications or
alternative avenues to achieve the desired flexibility in building design. She said that R10 allowed
a maximum height of 65 feet. She said that they had established the envelope where the property
would be rezoned within the red area. She said that the proposal anticipated the preferred
alignment for the Lamb's Lane Loop Road to connect over to Hydraulic Road.
Ms. Ragsdale said that the proposal was located 35 feet from Hydraulic Road. She said that there
had been significant discussion and input from the Georgetown Green residents, and their
proposal was 50 feet from the property line with Georgetown Green. She said that these setbacks
were appropriate, as they aligned with some of the surrounding building patterns, which predated
current zoning and land use policies. She said that this location was unique due to its school
campus, which also predated existing zoning and land use policies.
Ms. Ragsdale said that the table demonstrated the setback requirements for rezoning necessary
to provide flexibility for a high school center in rural areas. She said that the required setback from
Hydraulic roads and public roads not designated as internal was 75 feet. She said that for
residential districts, such as R10, the minimum setback was five feet, with a maximum of 25 feet.
She said that this rezoning would allow for a 35-foot setback, which still required a special
exception due to encouraging buildings more oriented toward the street in residential districts.
Ms. Ragsdale said that the height flexibility needed was up to 40 feet, which was a five-foot
increase from rural areas to accommodate this flexibility. She said that the concept plan provided
a 50-foot setback for Georgetown Green residents. She said that the narrative and staff report
suggested that the intention was for proffers to be submitted, committing to this concept plan and
limiting site uses to public purposes or similar, without including residential density or more
intensive development than R10 allowed.
Ms. Ragsdale said that they had recommended approval of the rezoning based on the narrow
scope of the request. She said that although it was atypical for them to recommend rezonings to
a more intensive district in rural areas, this was an existing and developed school facility. She
said that the proposal, including reduced setbacks and a five-foot height increase, would not
negatively impact adjacent properties. She said that the comprehensive plan and community
facilities chapter supported these elements.
Mr. Missel asked for clarification regarding parking and the relocated parking.
Ms. Ragsdale said that there was planning ahead for replacement parking on an area of the site
in the back where existing tennis courts were located.
Mr. Missel said that he was curious about the amount of extra parking required due to this addition.
He asked if they had an estimate.
Ms. Ragsdale said that the school's parking capacity was determined by a study conducted to
meet its specific requirements. She said that the information presented in the narrative
represented the expected demand.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
3
Mr. Clayborne read the rules for presentations from the applicant.
Kagan Squire, Project Manager for Building Services, said that he was accompanied by Building
Services Director Lindsay Snoddy, Deputy Director Matt Wertman, and consultants from Quinn
Evans and Timmons. He said that they wanted to provide an overview of the plan schedule and
a detailed presentation of the high school center to highlight their latest community engagement
efforts in assisting the planning design of the new facility. He said that they would also discuss
the traffic impacts from this project and share an update on the building's design.
Mr. Squire said that the Center 2 project was nearing the end of its schematic design phase, and
they planned to continue with the design of the building through the end of next summer. He said
that after that, they would solicit bids for the project construction, which was projected to begin in
late fall of 2024. He said that the school facility was expected to open for the 2026-2027 school
year.
Mr. Squire said that for this project, they were requesting to rezone approximately 9.9 acres of
the Lambs Lane campus from rural to R10. He said that the request aimed to provide flexibility in
the design concerning setback and height restrictions. He said that early designs indicated that
the center should be no closer than 35 feet to Hydraulic Road and 50 feet to the Georgetown
Green neighborhood property line, with a maximum building height of 40 feet. He said that the
new building would accommodate approximately 400 students daily and span around 60,000
square feet.
Mr. Squire said that they had limited the rezoning effort to establish a clear buffer between the
zoning districts. He said that this also helped preserve the rural character of the remaining portions
of the parcel. He said that replacement tennis courts and additional parking to accommodate the
needs would be built. He said that future routing of the loop road included in the Lambs Lane
Master Plan was outlined.
Mr. Squire said that ACPS had held several community engagement opportunities for diverse
stakeholder groups to seek feedback on planning, programming, and design of the project. He
said that opportunities dated back to spring of 2020 before the project was paused due to the
pandemic; efforts restarted this past spring. He said that these groups included students, families,
teachers, ACPS staff, local agencies, business leaders, and community groups.
Mr. Squire said that a traffic impact study was conducted in partnership with local government to
assess the current and future levels of service at six intersections surrounding the Lambs Lane
campus and the entire stretch of Hydraulic Road. He said that the study also investigated the
impact of completing the future loop road and analyzed three different scenarios for the best road
placement and terminus point for the proposed road.
Mr. Squire said that the TIA assumed that the development of the Lambs Lane campus would
generate an increase of 25% in the existing total traffic entering the school complex, with an
annual growth rate of 2.2% over the next 10 years. He said that for the two main intersections
affected by this project, the projected levels of service during peak hours did not exceed a C level
of service post-development. He said that the TIA ultimately recommended the best location and
terminus for the future loop road.
Mr. Squire said that the Center 2 project aimed to construct a small portion of the loop road, which
was to reconfigure the existing internal connector road in front of Albemarle High School. He said
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
4
that the remaining portion of the future loop road, as well as other improvements recommended
in the TIA, still required future funding by the Board of Supervisors. He said that 127 additional
parking spaces were needed for Center 2.
Mr. Squire said that it was estimated there would be 40 student drop-offs and pickups, four to five
buses, and 20 bikers or walkers at the Lambs Lane campus. He said that bike and pedestrian
facilities would be incorporated into the proposed facility's final site plan. He said that building
services would be relocated off-campus to another location, and the existing building would be
demolished, resulting in a reduction of traffic generated by that facility.
Kylan Shirley, Quinn Evans Architects, said that they had been working with ACPS for several
months to develop a schematic design for the High School Center 2 building on this site. He said
that the current building services site would become the location for the high school center after
an extensive planning process. He said that this involved studying various ways to navigate the
challenges posed by vehicular and pedestrian traffic while considering the Lambs Lane Master
Plan campus, sports integration, bus drop-offs, parent drop-offs, and student walking routes.
Mr. Shirley said that all these factors were taken into account, and they aimed to place this building
on a busy campus with the goal of improving overall campus operations as well. He said that this
plan included creating a new entry drive into the site. He said that the conceptual site plan being
presented had not been approved by the School Board. He said that the information presented
was still considered a concept and would require approval from the School Board in January.
Mr. Shirley said that the building plan could be seen at the center of the diagram, with Albemarle
High School located toward the top, indicated by the white outline. He said that the road would
follow the pathway around the bottom side of the building, where the current driveway was now.
He said that the project had identified a clear and distinct pedestrian and bike pathway into the
site, separating it from vehicular traffic. He said that cars moving into the site had been relocated
to the outside of the site, and driveways along the front of Albemarle High School had been
reoriented toward the stadium for clearer, more direct circulation and improved intersections.
Mr. Shirley said that this would also accommodate parent-student drop-offs better than the current
system, separating cars from queuing in parking lots during drop-off times at both the high school.
He said that the building was an L-shaped design that created a courtyard space. He said that as
they regained some of the asphalt for green space, the area between the entrances of Albemarle
High School and High School Center 2 would be developed into an entry plaza and campus green
space.
Mr. Squire said that Center 2 featured several sustainable aspects, including accommodating
solar panels, utilizing geothermal wells for mechanical systems, improving stormwater
management, enhancing the building envelope, and using native plantings. He said that the
building would achieve at least a LEED Silver certification, with a stretch goal of net-zero
readiness. He said that these strategies aligned with the comprehensive plan's community
facilities objectives and indicators of progress.
Mr. Bivins said that this was his district, his neighborhood, and his street. He said he had been
supportive of the project since its inception. He said that throughout the various iterations of the
Georgetown Green project, the team had made a strong effort to engage with the community on
issues not only related to the project but also concerning life near a high school. He said they
should recall their own experiences in high school and the communities they passed by daily, as
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
5
some of those same issues were facing the Georgetown Green.
Mr. Bivins said that as they consider education campuses, they should think about how they can
promote their intended purposes on the campuses. He said that they needed to adjust their
approach just to achieve changes in the requirements of 5 feet. He asked for clarification about
parent pickup and drop-off being relocated to the tennis court area. He asked if this decision had
been finalized.
Mr. Shirley said that the current plan involved expanding the parking lot near the tennis courts
from its existing capacity of 200 spots to accommodate students and staff from both schools,
creating additional parking spaces for after-school events. He said that the tennis courts would
be relocated behind the stadium, and the parent drop-off area would be repositioned. He said that
the stretch of road will be widened to serve as the parent drop-off area. He said that the new
parking lot will also provide multiple options for parents to exit the site efficiently.
Mr. Carrazana said that it appeared to be well-designed architecturally, as it aligned with his
professional expectations. He said that the land seemed valuable due to the surrounding
development, and it appeared that the site may be underutilized. He said that if they were
considering the future growth in this area, they should consider future needs, such as a three-
story building. He said that the current massing suggested no reason not to build taller; perhaps
even considering a 10-story structure could be beneficial. He said that shelling space was
significantly cheaper to build now compared to 10 or 15 years later.
Mr. Missel clarified that the proposed building would be net-zero.
Mr. Squire said that it would just be net-zero ready.
Mr. Missel said that he was curious about how net-zero ready and if they were for pursuing
sustainability.
Mr. Shirley said that the project would achieve at least LEED Silver certification, as the process
had just begun. He said that currently, they were targeting LEED Gold standards. He said that to
determine their readiness, they must progress beyond schematics. He said that their energy use
intensity goal was low enough that installing solar panels on the building would almost meet the
requirement. He said that they were pursuing a geothermal heating and cooling system based on
well-filled technology, which they believed would help them achieve their target. He said that the
school division had been working on determining how to acquire solar power.
Mr. Murray said that he strongly encouraged them to focus on regionally native plants rather than
just American or Virginia native plants. He said that LEED was a building standard, and there
were points available for landscaping. He said that there was the Sustainable Sites Initiative that
applied to the rest of the landscape, which they should consider. He said that he hoped they would
look into options such as permeable paving or other methods for capturing stormwater in parking
lots and directing it into parking islands. He noted that the campus was close to a water supply.
Mr. Moore said that he agreed with Mr. Carrazana's comments about underbuilding, and what
was really needed was another full high school on the northern side of the County. He said that
in terms of traffic impacts, there would be a significant influx of cars within a 20-minute period. He
asked if the proposal would see a reduction in parking spots for students and staff.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
6
Mr. Shirley said that there was a boomerang shaped lot by the stadium that would be reduced by
half. He said they would lose about 45 spaces. He believed that most of these spaces were
currently occupied by students. He said that the proposed 200-space lot would make up for the
loss.
Mr. Moore said that currently, Lambs Lane was the only access point for the parking, which was
already a narrow road shared by two other schools. He asked when Center Two might be
operational compared to when the road improvements would be completed.
Mr. Shirley said that the construction sequencing for this project had not been fully determined
yet. He said that the building services building would be demolished first to create space for the
roadwork. He said that the intention was to have the site work progress in one direction while the
building work occurred in the other direction, with the goal of completing the road as soon as
possible. He said that this was important because they needed to ensure access to the site.
Mr. Moore asked if the loop road would be completed by the time the center opens.
Mr. Squire said that the full loop road was not part of their project, and its completion date
remained uncertain. He said that funding from the Board of Supervisors was required. He said
that he was unaware of the precise timeline for the project.
Mr. Moore said that he appreciated the additional parking spaces, but he noted that they would
all be using one side road. He asked for clarification about "C-level service" when discussing
traffic services.
Matt Wurman, Deputy Director of Building Services, said that when performing a traffic impact
analysis, all roads and intersections received a grade ranging from A (good) to F (failing). He said
that the two main intersections relevant to this project's development were the Hydraulic and
Georgetown Green intersection and the Hydraulic and Lambs Road intersection. He said that
under existing conditions, Hydraulic and Georgetown Green intersection operated at a Level of
Service B or A during peak hours. He said that the other intersection operated at a C level of
service. He said that post-development of this project, both intersections were projected to
operate at a Level of Service C.
Mr. Bivins said that it should also be noted that part of what this situation involved, particularly on
Lamb's Lane, was that various buses, police officers, and first responders relied on Lamb's Road
for fueling their vehicles and servicing. He said that the County had a plan, in collaboration with
the school, to relocate this function elsewhere. He said that it may not occur within his lifetime,
but it would happen during the lifetimes of some members on the panel that there would be no
buses being repaired or police officers refueling at Lamb's Road. He said that this would result in
a modest reduction in activity. He said that the traffic flow through the area would improve as this
was where buses and first responders currently went to have numerous tasks completed for them.
Mr. Clayborne asked if the building would be served by backup power.
Mr. Shirley said yes.
Mr. Clayborne said he asked because he was considering climate resiliency. He said that the idea
was that this building could serve a dual purpose after a natural disaster by housing people within
the community if necessary.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
7
Mr. Shirley said that there was a separate building designation with the building code for
emergency shelter. He said that this type of structure was the most resilient and met very stringent
code requirements to fulfill this purpose. He said that currently, it was not planned that this building
would serve as an emergency shelter; however, it would have backup power to preserve essential
functions such as maintaining IT systems and kitchen equipment and ensuring building safety in
case of electrical loss.
Mr. Clayborne said that it may be worthwhile to consider given the increase in natural disasters
and hot summers causing difficulties for those without air conditioning.
Mr. Clayborne opened the hearing for comments from the public. There was no one wishing to
speak, so he closed the hearing to the public and brought the matter back before the Commission.
Mr. Murray said that there should be a better process for this type of request.
Mr. Missel said that considering the applicant's presentation of sustainability goals, such as solar
panels, there were numerous opportunities to transform the construction process into a learning
laboratory. He said that this could involve incorporating students in the design and construction
phases, which may already be happening but had potential for further development. He said that
such an approach would be particularly beneficial given the current weak state of the vocational
workforce and the need for improvement in this area.
Mr. Missel said that under the umbrella of sustainability and resiliency, he suggested having an
actual plan in place to implement net-zero ready, with measurable milestones along the way. He
said that this approach would be highly beneficial for securing capital funding and planning for the
future. He said that the City, County, and UVA were collaborating on a resiliency plan, and schools
could serve as an excellent location to integrate these efforts and identify opportunities.
Mr. Bivins said that if the staff could engage in a serious conversation while considering the
potential uses of the campus, this may present an opportunity to incorporate additional capacity.
He said that if the School Board was leaning toward the idea of expanding the space, it would be
beneficial to discuss this matter. He said that they should consider sustainability measures when
developing and maintaining natural spaces.
Mr. Moore said that funding the Lamb's Lane Loop would be important for future traffic impacts.
Mr. Bivins motioned to recommend approval of ZMA-202300008 High School Center II at
Albemarle High School for the reasons stated in the staff report and as discussed at the meeting.
Mr. Missel seconded the motion, which carried unanimously (7–0).
ZMA202200004 1906 Avon Street Extended
Mr. Andy Reitelbach, Senior Planner, said that the proposal was originally considered by the
Commission on February 14, 2023. He said that the Commission deferred the application at the
applicant's request to make revisions based on comments and concerns expressed at the
meeting. He said that the property included three parcels along Avon Street. He said that the
zoning of these three parcels was currently R1 residential, which permitted one residential unit
per acre. He said that on this property, which spanned over three acres, it would legally allow
three residential units.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
8
Mr. Reitelbach said that the overlay zoning districts encompassed managed steep slopes and the
entrance corridor, as Avon Street was designated an entrance corridor. He said that the
surrounding zoning of neighboring parcels included Mill Creek in planned residential development
(PRD). He said Avon Park was zoned R6 residential, while the Faith Temple Church comprised
two R1 residential parcels. He said that across the street, Spring Hill Village was a neighborhood
model development.
Mr. Reitelbach said that in the comprehensive plan, the property fell under the Southern and
Western Urban Neighborhoods Master Plan, where it was designated for neighborhood density
residential. He said that it recommended three to six residential units per acre, along with some
supporting uses and a maximum height of three stories. He said that the surrounding properties
on the west side of Avon Street were predominantly neighborhood residential. He said that they
had a high density of residences and green spaces, including Biscuit Run Park.
Mr. Reitelbach said that across Avon Street to the east, there was a range of recommended uses
such as urban density, residential, community mixed-use, office R&D, and light industrial flex. He
said that the proposal concerned a revised application for three parcels currently zoned R1, which
together totaled approximately 3.6 acres. He said that the existing use consisted of two single-
family detached houses along with accessory structures. He said that the applicant sought to
rezone the property to R10 residential, subject to proffers. He said that despite requesting a
rezoning to R10, they were proposing a maximum density of approximately six units per acre,
which would allow for a maximum of 21 units on the site.
Mr. Reitelbach said that the applicant was proposing a mix of single-family detached, single-family
attached, and multifamily residential units. He said that the revisions made from the initial
application in February included the applicant changing the requested zoning district from R15 to
R10 with proffers. He said that the applicant had reduced the maximum number of dwelling units
proposed from 38 to 21. He said that they had also decreased the proposed density from 11 units
per acre to six units per acre. He said that a maximum building height of 40 feet for block one,
which was the western half of the property adjacent to the Mill Creek subdivision, and 35 feet for
block two, which was the eastern half of the property along Avon Street, had been included.
Mr. Reitelbach said that the applicant had altered the layout of the proposed development. He
said that in their proffer statement, they had added a proffer restricting the construction entrance
for the proposed development from connecting with Hathaway Street through the existing Avon
Park. He said that as a result, the construction entrance would come directly off of Avon Street.
He said that the concept plan for the new proposal showed Hathaway Street emerging from the
existing Avon Park subdivision and terminating in a cul-de-sac. He said that there were several
parking areas to provide parking for the building envelope at the top of the property, which was
the west side of the property.
Mr. Reitelbach said that the small square building envelope adjacent to Avon Park was proposed
to be townhouses. He said that the 1920 house that could be seen identified was one of the
existing houses that was proposed to remain on the property. He said t hat the larger building
envelope in the bottom right of the concept plan was proposed to be a row of single-family
detached houses with an alleyway providing access to the rear of those houses. He said that the
fronts of these houses would face Avon Street.
Mr. Reitelbach said that the specifics of the proposal were that the applicant was proffering the
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
9
concept plan since this was a conventional rezoning to R10 rather than a planned district such as
PRD or NMD. He said that in the proffer statement, the applicant had identified major elements
required for site planning if the rezoning application was approved by the Board of Supervisors.
He said that the listed major elements included the internal street network and pedestrian
connections, building envelopes, setbacks as per the concept plan, a maximum building height of
40 feet, and a total number of residential units not exceeding 21.
Mr. Reitelbach said that the applicant sought to rezone to R10 rather than R6, despite maintaining
six units per acre, was due to the increased building height allowance. He said that R10 permitted
a maximum building height of 40 feet, while R6 did not. He said that the proffer statement
consisted of three parts. He said that the applicant had proffered a concept plan, which was
included in this application. He said that they had identified the major elements and determined
that a maximum of 21 residential units could be constructed on the property. He said that the
second part of the proffer statement concerned affordable housing, with the applicant proposing
that at least 15% of the total residential units constructed should be affordable. He said that the
third part of the proffer stated that the construction entrance for this new development would not
connect to the existing Hathaway Street in the Avon Park development.
Mr. Reitelbach said that according to the school system's data, approximately two students would
be generated for Mountain View Elementary School, which was currently over capacity and would
remain so with this development. He said that one student each was expected to be generated
for Walton Middle School and Monticello High School, both of which were currently under capacity
and would continue to be so after this development.
Mr. Reitelbach said that in their review and analysis of this proposal, staff identified several
positive aspects, including that the request was consistent with the recommended primary land
use of housing identified in the master plan. He said that the request aligned with the density
recommended by the Southern and Western Urban Neighborhoods Master Plan at six units per
acre. He said that the request was consistent or mostly consistent with the applicable
neighborhood model principles, and the proposal provided at least 15% affordable housing as
recommended in the comprehensive plan policy currently being enacted.
Mr. Reitelbach said that staff identified one concern: the lack of interparcel connections in the
proposed layout of the development. He said that the only vehicular interparcel connection was
Hathaway Street through the existing Avon Park neighborhood, but the applicant was proposing
a pedestrian connection from Avon Street up to the cul-de-sac area where Hathaway Street would
terminate in this development. He said that based on these positive aspects and concerns, staff
recommended approval of ZMA202200004 at 1906 Avon Street Ext.
Ms. Firehock said that typically, with new subdivisions, they preferred two entrances and exits for
easy access, but this project only had one. She asked if this was what was referred to as a lack
of interparcel connections.
Mr. Reitelbach said that was correct.
Ms. Firehock asked if the Fire Marshal had indicated any concerns about access.
Mr. Reitelbach said that the fire department did not express any concerns regarding fire safety in
relation to the proposed layout.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
10
Mr. Murray asked for clarification about the open space proposed for the project.
Mr. Reitelbach said that open space was not included in the major elements of the proffers. He
said that they would examine this further during the site plan review process, ensuring that all site
plan requirements for open space were met.
Mr. Missel said that regarding the interconnecting street issue, it appeared that the alley had been
designed for a potential future interconnecting street. He said that he recalled from their previous
conversation that there was an implication that they were relying on adjacent properties to
possibly connect to it in the future. He asked if this was still the intended plan.
Mr. Reitelbach said that his understanding was that they would not connect any further with the
adjacent properties. He said that the applicant may be able to provide more information on this
matter, but he believed that the stub-out was primarily for turnarounds, fire access, and
turnarounds for fire trucks and similar purposes.
Mr. Missel said that the illustrative exhibit showed two buildings in block one separated by a
significant open space. He asked if they would be required to build a building similar to those two
structures or if they could potentially construct a larger mass of a building that fits within the
building envelope represented in concept one.
Mr. Reitelbach said that was correct. He said that theoretically, they could construct a single,
larger building rather than the two depicted in the illustrative exhibit. He said that to do so, they
would need to adhere to the building envelope presented.
Mr. Missel asked if they would be required to meet the 20% open space requirements.
Mr. Reitelbach said that they would not be required to allocate 20% for open space. He said that
as this was a conventional rezoning, they would adhere to Section 4.16 of the zoning ordinance.
He said that if they opted for a cluster division, then they would have more specific open space
requirements.
Mr. Clayborne invited the applicant to provide a presentation.
Kelsey Schlein, Shimp Engineering, said that Jenny Smith, the property owner, was also present
and was the applicant for the request. She said that previously, they were double the density the
last time the project was before the Commission and largely relied on justifying how the Avon
Street corridor as a whole had developed far lower than the maximum density recommendations
for the comprehensive plan. She said that in response to feedback received from the Planning
Commission, the community, and continued follow-up conversations with the Avon Park HOA,
they had amended the application before them tonight.
Ms. Schlein said that in 2021, they began concept planning with their client and held a pre-
application meeting with the County in March. She said that during the meeting, they presented
a concept that demonstrated a connection from Hathaway Street to Avon. She said that as they
developed their concept further, they conducted conceptual grading and ran preliminary profiles
on the entrance while coordinating with VDOT. She said that they soon discovered that they could
not construct the entrance to Avon through property solely owned by Ms. Smith and still adhere
to VDOT's vertical curve requirements because the grade was too steep.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
11
Ms. Schlein said that considering this factor, they temporarily halted the project for approximately
a year to explore potential solutions. She said that they engaged in conversations with the pastor
of the neighboring church, seeking opportunities for a possible easement, property acquisition, or
even a property swap involving other land owned by Ms. Smith on Avon Street. She said that they
pursued several alternatives; however, none of them came to fruition. She said that the church
wished to retain its property and prioritize maintaining their westernmost parking area, which was
crucial to them.
Ms. Schlein said that their extended pause did not yield an alternative entrance point. She said
that in May 2022, they submitted the ZMA for R15 and 38 units. She said that this was very similar
to the concept that everyone had seen back in February, which had a connection from Hathaway
all the way to the adjacent property of the church to the east and did not show a connection to
Avon Street. She said that they made a few revisions, held a public hearing in February, and then,
in response to that, resubmitted a few times for further coordination with VDOT and the County
for R10 and 21 units.
Ms. Schlein said that in the February version, the Hathaway extension was originally shown
connecting to the church property so that, in the future, if that property were to ever redevelop,
that connection or an entrance could ultimately connect to Avon Street. She said that the revised
proposal had extended Hathaway Street and stubbed it out into a cul-de-sac turnaround. She said
that the overall concept was revised to a maximum of 60 units per acre, which was consistent
with the density recommendations in the comprehensive plan.
Ms. Schlein explained that the reason for rezoning to R10 was specifically for the proposed
multifamily units in block one. She said that they had been working with Ms. Smith for several
years, and she had a unique design vision as a landscape architect. She said that one unit type
that had been particularly important to her was a condominium-style unit along Avon Street. She
said that that portion of the property featured a stunning ridge with incredible views, making it an
ideal location for a housing unit type not commonly seen on Avon Street. She said that the request
for R10 was exclusively for a maximum height of 40 feet, and they proposed three stories as a
maximum with a 40-foot height limit for taller ceilings.
Ms. Schlein said that she believed that the R10 justification was further justified because, when
comparing the intent of R6 and R10, they were identical with the exception of an outdated
comprehensive plan reference. She said that the reference called for community and urban area
locations for medium-density residential use. She said that apart from this discrepancy, the intent
of both districts was the same. She said that they felt that they were developing at a density
consistent with the R10 guidelines while still upholding the intent of the zoning district at R10. She
said that this approach remained in line with the comprehensive plan designation at 6 DUI.
Ms. Schlein said that moving on to public street design, she would examine Hathaway Street in
relation to the approved site plan for Avon Park 1. She said that Hathaway Street was a public
road connecting to Avon and had been stubbed out to adjacent properties. She said that Avon
Park 2 developed over there, and she indicated the subject property they were looking at tonight,
located at 1906 Avon. She said that Hathaway Street was clearly designed for interparcel
connection and future expansion. She said that it was designed to accommodate up to 2,000
vehicle trips per day. She said that the current vehicle trips on that road, if this project were to be
fully built out, would be around 750. She said it was well below what it was originally designed for,
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
12
and included both Avon Park, Avon Park 1, Avon Park 2, and 1906 in the 750 calculation for daily
trips.
Ms. Schlein said that to revisit why they could not make an entrance point onto Avon Street
extended, Hathaway Street had an increasing vertical curve toward their property line, and they
needed to level that out by creating a landing before coming back down toward Avon Street. She
said that the elevation of Hathaway Street was 684 feet, and the elevation needed to be reduced
to 640 feet, which required a 44-foot drop. She said that this may be achievable if the road were
constructed with a decreasing curve or at a landing. She said that however, it was built as an
increasing curve to meet VDOT requirements, so they had to level it out before descending
further.
Ms. Schlein said that if they were to create an entrance, this would necessitate a waiver, including
a site distance waiver from VDOT. She said that they had gone through numerous revisions with
VDOT to address their concerns. She indicated the image on the slide, a profile illustrating where
the entrance should connect to meet VDOT requirements. She said that after further revisions in
February, they presented Hathaway Street extending all the way to the adjacent property line and
had more discussions with VDOT.
Ms. Schlein said that they recognized that due to the grade and the existing developed nature of
the adjacent properties to the north, which was Mill Creek's open space, and to the east, which
was the church, not providing the full connection through the stub-out to the adjacent property did
not meet the waiver of VDOT interconnectivity requirements. She said that in discussions with
VDOT, both of these criteria were met given the existing grade challenges on the property, as
well as the developed nature of the adjacent properties.
Ms. Schlein said that one favorable aspect in discussing this with them was that stubbing out the
street would create a fire access turnaround, whereas one did not exist in the public right-of-way
today. She said that she had a few more slides but she had covered much of the detailed
information. She said that she understood that the entrance and the road were the major concerns
and that there were questions as to why they did not extend Hathaway Street in their proposal.
Mr. Bivins thanked the applicant for providing plans that were easy to read and did not require the
use of a magnifying glass. He said that it was that he recalled there would be a construction
entrance which would not utilize Hathaway Street.
Ms. Schlein said that was correct.
Mr. Bivins said that vehicles using construction entrances tended to be larger than minivans and
Tundra pickup trucks, although a Tundra pickup truck was quite large. He said that his question
was why the said construction road could not be converted into an entrance onto Avon Street. He
said that although this may require some adjustments in the layout, if it could be done for that,
why not incorporate it into the community. He said that he believed this could benefit the
community and potentially eliminate the need for the odd cul-de-sac. He said that they would be
moving the same amount of people through the cul-de-sac, it would just be a narrow gate as
opposed to a wide road.
Ms. Schlein said that if they were to place it there, it would be near an existing driveway that
accesses the site. She said that they could not use this location because the construction entrance
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
13
must meet VDOT requirements. She said that they needed to ensure that the landing met the
vertical curve requirements when vehicles approached it.
Mr. Bivins said that all that needed to be said was that they were getting a free ride because it
was a construction entrance and VDOT did not require them to have the same standards as they
would if it were a permanent road.
Ms. Schlein said that they did not have to have the same standards for radii, landings, or anything
else.
Mr. Bivins said that people should be careful of trucks entering and exiting the site. He said that
they were managing a flow of people through a seemingly smaller and narrower entrance, which
accommodated 10 fewer dwellings than before.
Ms. Schlein said that overall, if they considered the six units in one area and five units in another,
they were looking at approximately 10 units. She said that traffic was expected to be relatively
low. She said that because this was a VDOT right-of-way, the connection would be considered a
commercial entrance rather than an alley, but it would be designed to feel like an alley with slow
driving speeds as a traffic calming measure. She said that they may need to show larger radiuses
on the entrance design, as VDOT would evaluate and approve this entrance.
Mr. Bivins asked if Hathaway was a public road.
Ms. Schlein said yes.
Mr. Carrazana asked if Ms. Schlein had further information to present about the concept of higher
roofs in the dwellings.
Ms. Schlein said that she did not prepare a specific section in this presentation but did have more
details about the layout.
Mr. Carrazana said that he wanted to know the floor-to-floor height in the proposal.
Ms. Schlein said that they would likely consider a 10-foot ceiling, taking into account the duct work
and electrical requirements. She said that this would involve examining how everything would fit
together. She said that ideally, they had discussed having high ceilings on the first floor, but they
may only be able to accommodate up to 12 feet at most.
Mr. Carrazana asked if they were looking at 10 feet for floor-to-floor.
Ms. Schlein said that if they did more than 10 feet, their floor-to-floor measurement might be
around 13 feet. She said that they might reach a 36-foot height with a 12-foot floor-to-floor
distance, and that was why they set the maximum limit at 40 feet. She said that if they had a 10-
or 11-foot ceiling, but maintained a consistent gap between floors, they aimed for 35 feet with any
type of roof pitch. She said that they were looking at that five extra feet for cushion.
Mr. Carrazana asked what the dimensions of the alley would be.
Ms. Schlein said that ultimately, the minimum distance required for fire access purposes would
be 20 feet.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
14
Mr. Carrazana asked if it would be two-way.
Ms. Schlein said yes, it would have to be due to traffic flows.
Mr. Missel asked if the dwelling units pictured on the bottom of the slide, with five that went across,
had pull-in parking or off-street parking.
Ms. Schlein said that there was driveway access.
Mr. Missel asked if there would be garages.
Ms. Schlein said most likely.
Ms. Firehock said that she was looking at the drawing that was previously shown, which included
the prior plan and this one. She said that there was a stormwater pond located at the bottom left
corner in the previous version, but in examining the new version, she could not locate it. She
asked if the stormwater pond was still intended for the same location.
Ms. Schlein said that it was not shown in the slides, but in the application, it was shown that
ultimately the water would go to that point of the property.
Ms. Firehock said that it was in the narrative but was not shown on the plan.
Ms. Schlein said that the proposed BMP was located in a similar area to what had been mentioned
earlier. She said that it was included in their conceptual plan. She said that they had indicated
two other potential locations for BMP installation as well.
Ms. Firehock asked if Ms. Schlein could speak to the pedestrian access. She asked what the
pathway was that people walked along Avon Street. She said that she also wanted to know more
about the recreational activities occurring on this site. She said that there was an increased
amount of preserved green space, and she would like to know about plans for both programmed
and passive recreation.
Ms. Schlein said that there had been a question regarding green space between the two buildings.
She said that they were open to modifying their plan to include a green space in that location. She
said that one block could accommodate townhomes or multifamily units, but there would not be a
continuous line of 14 townhomes, and there would be a break. She said that they had considered
creating a central courtyard as a focal point, which could be situated between two multifamily
buildings or groups of townhomes. She said that they recognized the importance of dog parks in
their design. She said that it was almost mandatory in subdivisions nowadays to have these types
of amenities.
Ms. Schlein said that they had had productive conversations with the Avon Park Homeowners
Association regarding their agreements with Avon Park 2 for any type of amenity payment sharing
or anything similar. She said that they had discussed a few ideas to make the place attractive,
including a dog park, gardens, and a central courtyard. She said that ultimately, whatever they
decided to include would further the conversation with Avon Park regarding beneficial amenities
on both properties and how the neighborhood could work cohesively with open space, green
space, and future connectivity to Biscuit Run.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
15
Ms. Schlein said that regarding the second question about the pathway to Avon Street, they had
discussed this with staff and acknowledged its critical importance, which they also emphasized in
their official statement. She said that during the site plan phase, they must determine whether it
would be a public or privately maintained pathway. She said that this would influence the final
design details, possibly including stairs.
Ms. Firehock said that it looked like they were going across quite a bit of topography at the very
bottom. She said that she did not know if they needed a foot bridge or something so people did
not need to hike down a ravine and back up.
Ms. Schlein said that as they had it displayed there, it was directly pulled from the public right-of-
way. She said that this considered the possibility that this may ultimately become a public
connection. She said that they needed proper coordination with staff to determine what
requirements must be met for a public connection and whether stairs or an asphalt path were
permissible.
Ms. Firehock said that it would need to work with the contours.
Ms. Schlein said that it would not be a slide straight down.
Mr. Murray said that he agreed with Ms. Firehock’s comments. He said that he also wanted to
mention that they had stormwater facilities. He said that if designed as biofilters in the appropriate
manner, these facilities could providing public space and incorporating attractive native plants into
their open space plan. He said that this approach resulted in a much stronger presentation.
Mr. Moore said that he had not been on the Commission in February but had reviewed the
changes and comments from then and now. He said that it was evident that this proposal had
been significantly improved. He said that he concurred with Ms. Firehock's obs ervations that the
elevation, steep slope, and abundance of trees presented a challenging development scenario.
He said that he understood it would be addressed at the site plan stage. He said that he believed
many of his fellow Commissioners' questions had already been addressed. He said that his only
remaining query concerned the 15% allocation for affordable housing. He asked if there was a
plan in place to distribute it evenly throughout the dwellings or concentrate it within the
townhouses.
Ms. Schlein said that in February, they revisited their plans and considered the long-term tenants
of Jenny's, which was rented at an incredibly affordable rate, around 60% AMI. She said that it
was likely that this situation would continue. She said that the availability of affordable units would
depend on the builders who joined the project and whether the units were for sale or rental.
Mr. Moore asked if there was any indication yet of how it might unfold in terms of rentals versus
owned homes.
Ms. Schlein said that there was not at this point. She said that there was flexibility in the proffer
statement that allowed for both rental and sales options.
Mr. Moore asked if 15% off 21 affordable units would be three units.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
16
Mr. Reitelbach said that he would have to defer to the Housing Manager to answer that question.
He clarified that it would be rounded up.
Mr. Moore said that in that case, it would be four units.
Mr. Bivins said that they had discussed sidewalks, and there was significant concern about the
sidewalk on Hathaway Street. He said that he observed that a similar sidewalk was being
constructed in block two. He asked how they could ensure that people from both the western and
eastern sides could safely reach the cul-de-sac without having to compete with vehicles in the
middle of the punitive alley.
Ms. Schlein said that they were likely to incorporate some type of pedestrian connection there, as
it was required by the County.
Mr. Clayborne asked which side of block one was the front, and which was the back.
Ms. Schlein indicated on the map which direction was the front of the building and the location of
the additional stairway.
Mr. Clayborne said that the topography of the site included a high ridge. He asked if the ridge had
an effect on the view from the neighborhood to the left.
Ms. Schlein said that the viewshed was primarily oriented toward a certain direction and would
likely provide a similar perspective for any viewer. She said that currently, there were woods in
the vicinity, but she was uncertain about the specifics. She said that perhaps one of the neighbors
could offer insight tonight. She said that if there were any obstructions, they might be more
apparent from the second story.
Mr. Clayborne asked if residents were responsible for maintaining those streets.
Ms. Schlein said that in the private portion of the project, once it reached the stage where
attorneys were working on the HOA documents, she believed they may have a more creative
HOA due to the unique situation of these units not benefiting from the private road. She said that
consequently, there might be some distribution and designation among lot owners regarding who
was responsible for maintaining the road.
Mr. Clayborne opened the public hearing.
Robbie Savage said that she was president and board chair for the Avon Park Homeowner’s
Association. She said that on Tuesday, February 14, their residents came en masse to discuss
their concerns about the development at 1906 Avon with them. She said that on September 12,
her vice-chair and she met with Ms. Schlein and Jenny and Don Smith to discuss the proposal.
She said that the meeting was cordial, and they reached several agreements that pleased them.
Ms. Savage said that there were still two major issues remaining for their community. She said
that first, the density of the development was a concern. She said that although it was now
proposed at R10, she believed it should be an R6. She asked why they should not grant a variance
for that height for the ceilings instead of increasing the entire area's zoning to R10. She said that
many of their homeowners had experienced approvals at higher levels with the expectation that
they would not be built out to that level, then someone else bought the property, it was rezoned
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
17
or whatever, and there they were back at the higher level. She said that there was a lot of concern
about that.
Ms. Savage said that Justin Shimp had requested for a special desk designation, R10. She said
that they would like to see it designated as R6 with a variance for the cathedral ceilings. She said
that this was not in the growth area and could sometimes be confused. She said that people
thought that because it was all in Avon Park, on Avon Street, it was high density. She said that it
was not, and she hoped that they could go with an R6 designation. She said that the second issue
was access. She mentioned that Commissioner Bivins asked a very good question, which was if
there would be a construction road, which they appreciated being incorporated into the new plan,
why could there not be a separate entrance.
Ms. Savage said that the development of Avon 2 had recently been completed. She said that her
community had experienced an influx of traffic, trucks, and dust as various materials were
delivered throughout the night. She said that the residents did not wish to endure this disruption
again. She said that it had been quite some time since their community could simply function as
a neighborhood without ongoing construction projects. She said that she had compiled a list of
questions that the community required to be addressed by the Commission, which she believed
she had already forwarded to them.
Ms. Savage said that her last question, before concluding her remarks, pertained to the Fire and
Rescue Department's assessment of the property on Avon, through Arden, and onto Hathaway.
She said that they had not yet seen this analysis. She said that with cars parked on both sides of
the street, they wanted to know what the fire and rescue evaluation looked like. She asked if they
genuinely satisfied with the safety of the area. She said that if so, she would appreciate having
access to that information. She said that they were more than willing to collaborate with the
Commission, developers, and property owners in order to find a mutually beneficial solution.
Shelly Smith said that she was one of the ministers at Faith Temple Church. She said they were
trying to understand the planning and various aspects of it. She said their concern was whether
the rezoning implementation would lead to any changes regarding Faith Temple’s property rights.
She said that from what she understood, their property directly attached to the development that
was going to be constructed. She said that she wanted to know if there would be anything affecting
any expansion they might want to do in the future, including things such as water lines or sewage
systems. She said they were unsure of all the different things that may arise, but they wanted to
know if this would infringe on their ability to do anything on their property.
Ms. Smith said that another question she had was regarding a section in the middle of the plan in
which there seemed to be some trees between the first of the five blocks and then one in the
corner. She asked how many feet there were from the roadway on the right side to the first unit
on Hathaway, and how close was the back of the church from the closest building. She said that
she wanted to know how it would appear with their church. She asked if there would be trees, if
the space would be open, or if there would be fencing. She said that they had a lot of people
cutting through the church property already, and she assumed it was coming from the current
units that existed.
Mr. Clayborne asked if there were any other members of the public who wished to speak. Seeing
none, he closed the public hearing. He asked if the applicant had any final remarks.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
18
Ms. Schlein said that she would clarify a few details about the church location. She said that in
2021, they met with Pastor Wright, but she would gladly meet with other church members to
discuss the situation further. She indicated on the slide the existing access point to the church,
and the church itself was located off-screen to the right. She said that Avon Street could be seen
coming down from the top of the image, and Mill Creek's entrance was situated to the east of the
church. She said that there was an existing tree line in this area. She said that all proposed
impacts on property were contained within the site. She said that any stormwater management
measures would ensure no adverse effects on adjacent properties or anything similar.
Mr. Clayborne said that the matter now rested with the Commission.
Ms. Firehock said that she would briefly address the question raised by the first public commenter
regarding their concern about the R10 compared to the R6. She said that she understood that the
proffer to keep it at R6 would run with the land and prevent anyone from coming back to make it
R10. She said that it was legally binding and could not be changed.
Mr. Herrick said that it was possible to modify it; however, this alteration was contingent upon
obtaining additional zoning approval. He said that the existing proposal would remain tied to the
land and could not be adjusted without undergoing the rezoning process once more to revise that
particular proffer.
Ms. Firehock said that any land could come forward to request that at any time.
Mr. Herrick said that was correct.
Mr. Moore said that it was basically R6 with higher ceilings.
Mr. Herrick said that it was R10 limited to 21 units on the subject property.
Mr. Moore asked what the setbacks were for R10.
Mr. Reitelbach said that R10 would have setbacks of a five-foot minimum from the right-of-way
for the exterior edge of the sidewalk, a maximum of 25 feet for the right-of-way of the exterior
edge of the sidewalk if the sidewalk was outside of the right-of-way, and five feet minimum for a
side setback. He said that there was no maximum for a side setback, and there was a 20-foot
minimum rear setback with no maximum rear setback.
Mr. Moore asked if the last single-family home in the row nearest to the church could be positioned
only five feet from the property edge where the tree line currently existed.
Mr. Reitelbach said that was correct.
Mr. Clayborne said that density and access had been raised as issues. He said that they had
touched upon it a little bit but could delve deeper into the subject. He said that he would propose
discussing those two matters to be considered, starting with density. He asked if there were
thoughts and reactions to what had been discussed, particularly regarding R10 versus R6.
Ms. Firehock said that the new density had much less impact and she observed a significant
increase in infiltrative open space, which suggested that the overall site development would have
less road mileage. She said another aspect to consider, which was the alley's width, measured
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
19
at approximately 25 feet. She said that this width was similar to the neighborhood streets in
Charlottesville where cars were parked on both sides. She said that one could think of it as an
urban street. She said that if they exited the building and proceeded outside, they would encounter
numerous such streets. She said that she had driven down many of them to reach this meeting,
often getting stuck behind people driving at a slow pace due to the narrow widths.
Mr. Missel said that he had one follow-up question regarding the setback issue. He asked about
the general advantages of having an R10 zoning, specifically what specific benefits it offered and
enabled that were not currently being utilized by the applicant. He said that alternatively, it could
be asked what additional benefits the applicant could take advantage of in addition to building
height.
Mr. Reitelbach said that the only other design requirement that would be different was minimum
lot size, which related to density. He said that regarding setbacks, those for R6 and R10 were the
same.
Mr. Missel said that the density seemed comfortable to him, and he believed that the mitigation
for the building height approach and the understanding that the proffer runs with the land satisfied
his concerns regarding density.
Mr. Moore said that the density in units per acre was approximately six units in Avon Park and
the density was similar in this proposal.
Mr. Missel said that he had a brief comment about the height. He said that since this was located
on the entrance corridor, it would be reviewed by the ARB. He said that without any sections, he
found it challenging to determine the extent of the looming presence. He said that it could be
highly visible or significantly reduced by block two. He said that he was confident that the height
difference would be mitigated through the ARB's consideration of materials and colors, among
other factors. He said that he ultimately believed it would be visible from the entrance corridor.
Mr. Bivins said that he was mostly accepting of the density, but still had some issues he would
alter address. He said that when individuals visited and expressed their enthusiasm for enhancing
the aesthetics of the location, they should receive additional recognition for their efforts. He said
that he hoped that, given the owner's background as a landscape architect, this space would be
characterized by joy and not merely used to persuade the County to approve the project.
Mr. Bivins said that he had continued to express his concerns about one-way streets with only
one entrance and exit. He said that he remained distressed by the fact that they had such streets,
and he could make a sarcastic comment about people managing to climb Pikes Peak in just
seconds. He said that he understood that rearranging dirt was an expensive process. He said that
nevertheless, he believed it was healthier for communities to have multiple entry and exit points,
so he would continue to advocate for this change whenever possible.
Mr. Clayborne said that there was a general consensus that they all agreed with Mr. Bivins’
sentiment. He asked what other concerns needed to be addressed before they moved on. He
said that he wanted to make a comment regarding property rights. He said that they must not
negatively impact someone else's property by allowing something to happen to a specific
property. He said that all impacts to surrounding areas were reviewed and analyzed, as stated in
the staff report available online.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
20
Mr. Missel said that looking at the southern property boundary, which is the long property
boundary that adjoined the parking area that is part of block one. He said that the parking area
setback appeared to be at least at its minimum setback on the illustrative exhibit and seemed
quite tight to that property boundary. He said that if he were living in one of those homes along
Tudor Court, he might appreciate the ability to have a buffer against that space. He said that he
realized this was a circulation issue, but it was part of the parking envelope. He said that if there
were a way to shift that block slightly to the north to allow for a wider buffer between the homes
on Tudor Court and the parking associated with block one.
Mr. Missel moved that the Planning Commission recommend approval of ZMA202200004 1906
Avon Street Extended for the reasons stated in the staff report. Mr. Carrazana seconded the
motion, which passed unanimously (6-0).
Committee Reports
Ms. Firehock said that she attended the Historic Preservation Committee meeting. She said that
they primarily focused on editing the language for the comprehensive plan. She said that she
empathized with the staff, as they had put in a significant amount of effort and recommendations
to condense objectives and collapse them. She said that for example, there were initially five
objectives they reduced to three. She said that during the meeting with the committee, it was
suggested that these objectives be pulled back out and separated, and staff acquiesced. She said
that at the end of the day, she believed the language would be clearer.
Ms. Firehock said that they attempted to refine specific wording, such as one instance where the
text seemed to recommend that all residents would have access to all historic sites. She said that
it seemed as though they were planning to open up everyone's land for visitors to explore
wherever they wanted. She said that they fixed this issue and hopefully prevented any
unnecessary alarm. She said that there was still strong support among committee members for
an action item to create a historic preservation ordinance.
Ms. Firehock said that the purpose of this ordinance would be to prevent the demolition of historic
properties without obtaining a permit first. She said that currently, they required permits for
demolitions; however, since there was no penalty for tearing down a property without a permit,
the ordinance lacked enforcement. She said that she looked forward to seeing the redrafted goals
before appearing before the Commission.
Mr. Missel asked if it was required to document a property.
Ms. Firehock said that currently, there was nothing that made anyone have to let the County
document the property, and instead they had to request property owners to document it.
Review of Board of Supervisors Meeting: November 15, 2023
Mr. McDermott said that at the Board of Supervisors meeting on November 15, they had several
public hearings. He said that the first one was regarding the Walnut Creek Personal Wireless
Service Facility Tower, which sought a Tier 3 Tower Special Use Permit. He said that this permit
was approved with five votes in favor and one vote against, so it was not unanimous.
Ms. Firehock asked who was the nay vote.
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
21
Mr. McDermott said that it was Supervisor Mallek. He said that there was a hearing on the Briary
Creek or Rebenton Farm boarding camp, a large facility with cabins located on the Fluvanna
County line. He said that it received unanimous approval from the Board, who appreciated its
potential benefits for the community. He said that the zoning text amendment related to bonus
factors for residential density was discussed in detail by the Board due to concerns expressed in
public comment. He said that despite these concerns, the Board ultimately approved it with five
votes in favor and one against from Chair Price, who expressed concerns about its impact on
affordable housing.
AC44 Update
Mr. McDermott said that for AC44, they were getting into the land use and transportation element.
He said that they were starting to visit all the CACs to present some of those things. He said that
over the next two weeks, starting again next week and the week following, they would finish off
all the CACs. He said that at the presentations, they would discuss what activity centers mean,
how they relate to transportation, and also some minor changes to land use designations in the
comprehensive plan that they were considering.
Mr. McDermott said that they were preparing to present this information to the Commission
meeting at December 19. He said that initially, they planned to discuss the goals and objectives
for transportation and land use at this meeting, but they recognized that there was background
information related to land use and transportation that needed to be presented first. He said that
they would hold a work session on December 19 to address these issues, such as how density
should be calculated and minor changes in land uses.
Mr. McDermott said that after the work session, they would present the goals and objectives for
land use and transportation at a meeting in January. He said that once this was completed, they
would move forward to the Board regarding these items, concluding phase two of the process.
He said that in the new year, they would focus on action steps for phase three.
Mr. Clayborne asked if the December 19 work session would begin at 6 p.m.
Mr. McDermott said that was correct. He said that there was only a work session scheduled. He
said that there were no public hearings planned for that evening. He said that the agenda included
solely a work session on this item, he would not be able to attend as he would be departing for
the holidays at that time. He said that David Benish, who had extensive knowledge of both this
topic and the operations of the Planning Commission, would be substituting for him.
Mr. Murray asked when the Riparian Buffer Overlay District would return to the Commission.
Mr. McDermott said that he would need to check on that. He said that they had a work session
regarding it. He said that the riparian buffer ordinance was not scheduled to return to the
Commission until after January. He said that he would contact Scott Clark and Frank Pohl to
inquire about an estimated date.
Mr. Murray said that he suggested releasing the new draft of the language as soon as possible.
He said that this was important due to its extensive nature, allowing them sufficient time for review.
Mr. McDermott said that the upcoming meeting for the housing development initiatives was
scheduled for next Monday, and Stacy Pethia had sent the materials last week. He said that he
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
22
had a tentative general agenda. He said that they were meeting on December 4.
Mr. Missel asked if there was a Zoom link for the meeting.
Ms. Firehock asked where it would be located in Northfork.
Mr. McDermott said that it would be in the Town Center IV. He said that the meeting would be
publicly available for access. He said that yes, there would be a Zoom link. He said that the
information should be accessible on the Board of Supervisors' web page.
New Business
There was none.
Old Business
There was none.
Items for follow-up
Mr. Bivins said that when they received future projections of students joining the school system
from developments, they had to consider that the impacts would not be realized for several years.
He said that the concern over limited seating today was not relevant as it did not impact the long-
term plan. He said that often, when people spoke about the issue, they mentioned that there was
no room at Mountain View or Albemarle High School. He said that he was unsure if there was a
way to alleviate the community's concerns regarding overloading the schools.
Ms. Firehock said that they might have a plan to expand the school, which could coincide with
development.
Mr. Bivins said that he had become more aware of setting the tone and expectations for those
who listened to County business.
Mr. Clayborne asked if the enrollment projections considered the future capacity projections.
Mr. McDermott said that the projections for the number of students generated were for a full build-
out per year; these were the expected numbers for each grade level. He said that the available
seats at schools assumed no changes in existing facilities. He said that when there was a plan
for new schools, as was recently approved with funding for two new schools and a high school
center, they ensured that this information was well noted in the staff report and presentation.
Mr. Carrazana said that in the past, they would receive a report from the School Board which
included projections for each school, however, it had been several years since they last received
such a report. He asked if it was possible to regularly receive this report again.
Ms. Firehock said that they also received a copy as part of the CIP Advisory Committee.
Mr. Carrazana said the report was beneficial as it provided him with an understanding of the plans
for these schools. He said that there were numerous developments, and they all needed to share
their impact on the school. He said that this information would be passed on to the School Board
ALBEMARLE COUNTY PLANNING COMMISSION
FINAL MINUTES - November 28, 2023
23
and incorporated into their planning process. He said that having awareness of such projects,
informed by growth in specific areas, would be helpful.
Mr. McDermott said that he would contact the schools, as they were currently developing a
redistricting plan for schools. He said that he knew they had considered future projections for all
the schools in that redistricting plan. He said that he believed the report would contain such
information. He said that he would reach out to them and determine what might be most
appropriate to share with the Commission.
Mr. McDermott said that it was announced that Michael Barnes would be joining their team as the
Planning Director. He said that Mr. Barnes was a UVA graduate and had previously worked as
the planning director in Waynesboro for several years. He said that over the past four years, he
had been with VDOT in the Charlottesville area, where they had collaborated extensively. He said
that Mr. Barnes was scheduled to commence his role in January.
Adjournment
At 8:05 p.m., the Commission adjourned to December 4, 2023, the Joint Board of Supervisors
and Planning Commission Meeting on Monday, December 4, 2023, at 1:00 p.m. at North Fork
(994 Research Park, Charlottesville, VA 22911)
Kevin McDermott, Director of Planning
(Recorded by Carolyn S. Shaffer, Clerk to Planning Commission & Planning Boards; transcribed
by Golden Transcription Services)
Approved by Planning
Commission
Date: 12/19/2023