HomeMy WebLinkAboutWPO201000056 Review Comments Erosion Control Plan 2010-12-02� OF AL ,. vIRGINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Ashcroft Phase 3, E &SC plan (WP0201000056, WP0200700053) Plan preparer: Dominion Engineering & Design LLC. [fax (434) 979 -1681] Owner or rep.: Liberty Land Ltd. c/o Richard L. Beyer [fax (434) 977 -7219] Plan received date: 24 November 2010 Date of comments: 3 December 2010 Reviewer: Max Greene The WPO plan submittals for Ashcroft Phase 3 received 24 November 2010 have received Engineering review. The WPO plans for this project can be approved once the Storm Water Management Agreement has been submitted, approved and recorded in the Clerk's office. A completed copy of the Standard Stormwater Maintenance Agreement and fee for recordation for the stormwater facilities is required prior to final approval. [ 17 -304E] The forms and instructions can be found on the Community Development Department Web site on www.albemarle.org. Once the SWM Agreement is recorded, the WPO bonds can be posted for approval. The WPO bonds will be approved prior to the grading permit issuance. The WPO bonds are split due to the requirements generated from 17 -204.f of the County Ordinance. • The SWM bond amount for WP0200700053 "Ashcroft Phase 3" is $140,847.00. • The E &SC bond amount for WPO 201000056 "Ashcroft Phase 3" is $485,400.00. The forms and instructions to post the Water Protection Ordinance Bonds can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Once the E &SC bond and the SWM bond have been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. Filc: E2 csc,swm_MRG_Ashcroft Phasc 3 Approval.docx Engineering Review Comments Page 2 of 2