Project: Ashcroft Phase 3, E &SC plan (WP0201000056, WP0200700053)
Plan preparer: Dominion Engineering & Design LLC. [fax (434) 979 -1681]
Owner or rep.: Liberty Land Ltd. c/o Richard L. Beyer [fax (434) 977 -7219]
Plan received date: 24 November 2010
Date of comments: 3 December 2010
Reviewer: Max Greene
The WPO plan submittals for Ashcroft Phase 3 received 24 November 2010 have received
Engineering review. The WPO plans for this project can be approved once the Storm Water
Management Agreement has been submitted, approved and recorded in the Clerk's office.
A completed copy of the Standard Stormwater Maintenance Agreement and fee for recordation
for the stormwater facilities is required prior to final approval. [ 17 -304E] The forms and
instructions can be found on the Community Development Department Web site on
www.albemarle.org.
Once the SWM Agreement is recorded, the WPO bonds can be posted for approval. The WPO
bonds will be approved prior to the grading permit issuance.
The WPO bonds are split due to the requirements generated from 17 -204.f of the County
Ordinance.
• The SWM bond amount for WP0200700053 "Ashcroft Phase 3" is $140,847.00.
• The E &SC bond amount for WPO 201000056 "Ashcroft Phase 3" is $485,400.00.
The forms and instructions to post the Water Protection Ordinance Bonds can be found on the
Community Development Department Web site on www.albemarle.org.
You may contact Ana Kilmer (Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures and Maintenance Agreements.
Once the E &SC bond and the SWM bond have been posted, you may contact the Department of
Community Development to arrange a pre - construction meeting with a County Erosion &
Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased
or the need for additional control measures required to protect the site, additional fees will be
required.