Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000024 Review Comments Bond Estimate 2010-08-24 (3)
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: TABOR PRESBYTERIAN CHURCH PROJECT NUMBER: WPO201000024 DATE OF ESTIMATE: 08/24/10 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.42 $1,500.00 $2,130.00 SILT FENCE LF 108 $5.00 $540.00 TREE PROTECTION LF 0 $5.00 $0.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 643 $3.00 $1,929.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0.4 $1,000.00 $400.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 3 $500.00 $1,500.00 INLET PROTECTION EA 0 $200.00 $0.00 OUTLET PROTECTION EA 4 $200.00 $800.00 EC -2 & 3 DITCH PROTECTION LF 432 $10.00 $4,320.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 13619.00 PROJECT MANAGEMENT LS 15% 2042.85 TOTAL 15661.85 PROJECT ADMINISTRATION 10% 1566.185 BOND AMOUNT REQUIRED jj 17300.00 readsheet last revised:3 -10 -10