Loading...
HomeMy WebLinkAboutCLE201000200 Review Comments Zoning Clearance 2010-12-10Application for Zoning Clearance g ®� CLE # ��RGIN�P Zoning Clearance = $35 OFFICE , Oy' Checic # Date: PLEASE REVIEW ALL 3 SHEETS Receipt # Staff: PARCEL INFORMAT Tax Map and Parcel: Existing Zoning 1 ' Parcel Owner i l Parcel Address: qa3 GARDENS (30ULEVA&b City CliNkLQTTESVILL-i State ViP,6wyfA- Zip a Ol (include suite or floor) PRIMARY CONTACT Who should we call /write concerning this project?. _.0_q9kJL PE1V0_CP_ , TAx MME A&DZ, Address : 3110 FAmVir_W PAkK UR 5TE 30D City FALLS C4wZC4 State V 1 kGI Nl1)' Zip Office Phone: (7o3) 302,) -4 (oLIV Cell # Fax # E -mail 5Pc nCOU r. C4'-(V enSCO.Co APPLICANT INFORMATION Check any that apply: Change of ownership Change of use Change of name New business Business Name/Type: E N's CO _10C, Previous Business on this site U NK NO W tJ Describe the proposed business including use, number of employees, number of shifts, available parking spaces, number of vehicles, and any additional information that you can provide: USE a 0FFI CE SPAC 15 �° # OFEM PLOYEES eF 5111FT5 '� 4 AVAii -A6LE PARKING 5PAL'E5 _' 45 -A; OF VE141eLE5 .!! *This Clearance will only be valid on the parcel for which it is approved. If you change, intensify or move the use to a new location, a new Zoning Clearance will be required. I hereby certify that I own or have the owner's permission to use the space indicated on this application. I also certify that the information provided is true and accurate to the be Icnowledge. I have read the conditions of approval, and I understand them, and that I will abide by them. Signatur Printed M 1 LA-N' S, &Xi JbA /00V iC . APPROVAL INFORMATION [ ] Approved as proposed [ ] Approved with conditions [ ] Denied [ ] Backfow prevention device and /or current test data needed for this site. Contact ACSA, 977 -4511, x117. [ ] No physical site inspection has been done for this clearance. Therefore, it is not a determination of compliance with the existing site plan. [ ] This site complies with the site plan as of this date. Notes: Building Official Date- 6 f i - _ Date f &I Zoning Official Other Official Date .County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 Revised 04/28/08, 10/13/09 Page 2 of 3 Intake to complete the following: Y Is LI, HI or PDIP zoning? If so, give applicant a Certified Engineer's Report (CER) packet. Y Wil ere be food preparation? If so, give applicant a Health Department form. Zoning review can not begin until we receive approval from Health Dept. FAX DATE Circle the one that applies Is parcel on private well or uater?' If private well, provide Hea men form. Zoning review can not begin until we receive approval from Health Dept. FAX DATE Circle the one that ap es Is parcel on septic o ublic sewer? Y Wi ou be putting up a new sign of any kind? If so, obtain proper Sign permit. Permit # Y/n Wil here be any new construction or renovations? If so, obtain the proper Permit. Permit # Zoning to complete the following: Reviewer to complete the following: Square footage of Use: �. 7 3(0 Perm tted as: Under Section: Supplementary regulations section: Parki fop 0 Required spaces: (a Y/N (� Items to be verified in the field: Inspector: Date: 1 ! �' la rob— rub Viol tins: Y / If so\, ist: Pr er I f so, List: Varia _ e: Y/� If so, t: SP's• YO If so, st: Clearances: SDP's i Revised 04/28/08, 10/13/09 Page 3 of 3 Zoning Clearance Checklist Applicant MUST HAVE the following information to apply for a Zoning Clearance: 1) Tax Map and Parcel or Address, Building Name, Suite/Unit /Floor numbers, if applicable. 2' ) A Floor Plan - either a sketch or an architectural drawing a) If using less than the entire structure, note the location within the structure; b) Note the total square footage of the use; c) Note the square footage of each room or area of use; d) Note the use of each room or area of use. Conditions of Approval FIREWORKS: 1. No person shall sell, offer for sale, store, display or discharge any fireworks in any filling station or on any premises where gasoline or other inflammable liquids are stored or dispensed. (Code 1967 10 -13.) County Code Section 6 -200 and 6 -300 and must be a minimum of 100 ft from any gas pumps /propane distribution tank. 2. The site shall be cleaned and restored to its original condition on or before July 11th. This shall include removal of all structures, signs, debris, and the like. 3. A thirty (30) foot front setback shall be maintained, Display shall be located so as to avoid traffic congestion. Modifications subject to Zoning Administrator's approval. 4. Building permits shall be obtained for all proposed structures and /or lighting. 5. Sign permits shall be obtained for all proposed signage. 6. The sale of fireworks requires a special permit from Fire/Rescue department. CHRISTMAS TREES: 1. The outside storage of combustible material or flammable materials shall be located so as not to constitute a hazard and shall not be less than 15 feet from any building on the site. Any open burning must comply with the Virginia Statewide Fire Prevention Code and the Albemarle County Code. 2. The site shall be cleaned and restored to its original condition on or before January 2. This shall include the removal of all structures, signs, debris, and the like. 3. A thirty (30) foot front setback shall be maintained, Display shall be located so as to avoid traffic congestion. Modifications subject to Zoning Administrator's approval. 4. Building permits shall be obtained for all proposed structures and /or lighting. 5. Sign permits shall be obtained for all proposed signage. OTHER REVIEWS: 1. Is the property on public or private water /sewer? Private requires Health Department, Public requires ACSA review (2 to 5 days) 2. Will you be operating a bakery? USDA review is required (approx. 2 weeks but as long as 6 weeks) 3. If you are serving prepackaged baked goods but not making them on the Premises, only Health Department will review. (2 to 5 days) 4. If you will be operating any business that is in an industrially zoned district or of an industrial nature you will need to provide a Letter of Performance Standards or Certified Engineer's Report (a staff member will provide an information packet addressing this requirement) (5 to 10 days as soon as the Letter or Report is received by this Department) 5. If there has been no site inspection within the last three (3) months for the parcel /site, then one will be conducted to verify that the project is in compliance with an approved site plan (if applicable). Revised 04/28/08, 10/13/09 Page 1 of 3 - EXHIBIT B SITE PLAN SHOWING THE GENERAL LAYOUT AND THE LOCATION OF THE PREMISES THEREIN -1 1 if - I win' I ss V= Mm. ....... .. m ... m I I he (33rairdens. I -76, 7.2 (0 671p- ........... . ..... 4 4, 14 OPI:_i\l FL0DPPL,4Af 21 Ff q p r4 -C rn. I FIER Wt CIA t, -� oil I'lco um JE k?;m 00 CAAAW VrOA .111.9m -76, 7.2 (0 671p- ........... . ..... 4 4, 14 OPI:_i\l FL0DPPL,4Af 21 Ff q p r4 -C rn. I