HomeMy WebLinkAboutSP201000046 Review Comments Special Use Permit 2010-12-16�� OF ALg�
County of Albemarle
Department of Community Development
Memorandum
To:
Scott Clark
From:
Bill Fritz
Division:
Current Development
Date:
December 16, 2010
Subject: SP 2010 -46 and 47 New Hope Community Church
The County Engineer has provided comments which I agree entirely with. These comments will require
substantial redesign of the site. Therefore, my comments are limited to general observations about this
proposal rather than specific comments on the submitted plan.
1. A critical slopes waiver likely be required for any site layout proposed. I recommend that this
waiver be processed with the special use permit. In order to process a critical slopes waiver the
applicant must
- Make a written request (This request should clearly indicate what critical slopes are
proposed to be disturbed and what type of disturbance will occur. In order for the waiver
request to receive adequate review a plan of sufficient detail will be necessary.)
- Submit a fee of $180 [Chapter 18, Section 35(g)]
- State reasons and justifications for the request
- Describe any alternatives they are proposing to address the provisions of the ordinance
- Address each of the findings contained in 4.2.5(a)(3)
2. In addition to locating the stormwater management facilities below the development it is
recommended that the drainfields be located below the development to remove the necessity of
pumping effluent.