HomeMy WebLinkAboutWPO201000066 Review Comments Erosion Control Plan 2011-01-18OF AL
O
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner /Applicant:
Plan received date:
Date of comments:
Reviewer:
Moores Creek Pump Station Improvements— WP0201000066
Matthew D. Buswell, P.E.
[mbuswell @ hazenandsawyer. com]
Rivanna Water & Sewer Authority Moore Creek
8 December 2010
18 January 2011
John P. Diez — Engineering Technician
A. Erosion and Sediment Control Plan
1. All erosion and sediment control measures must be within the limits of disturbance. This includes
the construction staging and stockpile area. Please revise.
(Rev. 1) Comment has not been addressed. Inlet protection inlets must be within the limits of
disturbance.
2. Please provide details for the turbidity curtain. Please refer to the Virginia Erosion and Sediment
Control Handbook, section 3.27.
(Rev. 1) Comment has been addressed.
3. Please provide a Utility Stream Crossing (USC) on Moores Creek. Please refer to the Virginia
Erosion and Sediment Control Handbook, section 3.25.
(Rev. 1) Comment has been addressed..
4. (Rev. 1) Comment has been addressed.
5. Please provide a construction sequence.
(Rev. 1) Please disregard comment.
\\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000066 - Moores Creek Pump Station Improvement \CDE2_esc_JPD_Moores
Creek Pump Station Improvements. doc