Loading...
HomeMy WebLinkAboutWPO201800074 Checklist WPO VSMP 2024-01-24 WPO FILE CLOSEOUT CHECKLIST wpo it_ 02 0/8 0co 7 u._. s C�� E BIR Inspections - • " �BIESC performed with approved plan. N/,q- BISWM performed with As-Built plan. C M���ftv"_ AA)Siv''x 2 Required Docs(either in CV or paper copy) ✓ CGP VAR10 for this project: 11AR to 5 t9 o ✓ CGP VAR10 that treats SWM for this project: '' s4vih-& ✓ Albemarle County Application • FO"I General VPDES Permit Registration.Statement i/ Approvedf&SC and SWM Plans - Nor +or> SWPPP • ✓ Approved Bond Estimate 1U/A Nutrient Credit Purchase Affidavit • ✓ Recorded Documents:SWM Maintenance Agreement, Easements (v l,4 As-Built Construction Record Drawings/Certification Manufacturing and Installation records Pipe video Current survey General VPDES Permit N.O.T. • Verify all fields;verify still active;reference other VAR10"comments"for swm nspections:2 minimum with photos. Photos of all swm bmps BIR release/reduction form Erosion Control,or SWM Performance Bond Release: For releases: Update CV review status to"approved/complete". For reductions: Update CV review status to"denied/complete",and enter reasons-for denial in �fhe comments box. tu/4 An Eloeefa—Hofflail 61-7Act 011* 1. ,S JVV,. Sq�s�i 131 w e0 2°1�1 2 19'r�fir-Dfvt& D T 3 1�'�A�7'"v, A 2`I_2-yC