HomeMy WebLinkAboutARB201000123 Review Comments Final Site Plan and Comps. 2011-01-18ARCHITECTURAL REVIEW BOARD STAFF REPORT
Project #/Name
ARB- 2010 -123: Town & Country Shopping Center
Review Type
Final Review of a Site Development Plan
Parcel Identification
Tax Map 78, Parcel 9C
Location
On the north side of Route 250 East, approximately 175' east of Town and Country Lane
Zoned
Highway Commercial (HC), Entrance Corridor (EC)
Owner /Applicant
Tap Investments LLC /Balzer and Assoc., Inc. (Bill Moore)
Magisterial District
Rivanna
Proposal
To construct an 80' x 160' multi - tenant retail building and parking lot with 69 spaces. Site access provided by easements to
the north and west from Town and Country Lane. A retaining wall, approximately 220' long with a maximum height of
8.0', is proposed along the front elevation.
Context
The proposed development is located in the Pantops commercial area along the densely developed Route 250E EC. This
section of the EC is characterized by a mix of developments including auto dealerships, restaurants, and retail/office space.
Visibility
The proposed building and site development are expected to be highly visible from the EC due to the close proximity to the
Corridor. The roof area of the one - story, 22' tall building is expected to be visible while descending, westbound, from the
Rolkin Road intersection.
ARB Meeting Date
January 3, 2010
Staff Contact
Eryn Brennan
Project History
DATE
APPLICATION/REVIEW TYPE
RESULT
12/6/10
AR132010 -123, Work Session
The ARB reviewed the application submitted on 10/25 as work session item and comments were
provided to the applicant for the benefit of their next submission (Attachment A).
10/25/10
AR132010 -123, Final Review of a
The applicant submitted an application for final review on 10/25 for the 12/ 6 ARB meeting.
Site Development Plan
Several of the revisions requested by the ARB at the September 7 meeting were not addressed in
the resubmittal and the application was deemed incomplete. However, based on the substantive
design revisions requested by the ARB at the preliminary review, staff recommended that the 12/6
meeting be used as a work session to approach resolution of the larger design issues, which are
comments 1, 2, and 10 in the action letter from the 9/7 meetin (Attachment B).
9/7/10
AR132010 -76, Preliminary Review
The ARB reviewed a preliminary site development plan for this application on 9/7/10. Comments
of a Site Development Plan
were provided to the applicant for the benefit of their next submission.
7/27/10
SDP2010 -59, Preliminary Site Plan
Approved
ANALYSIS
REF I ARB COMMENT
ISSUES
RECOMMENDATION
ARB Work Session Comments — 12/6/10
1
There is a concern about the scale of the
The applicant has revised the color of the roof
Identify the colors proposed for the
corner tower roof elements.
fascia board and the element identified as the
roof fascia board and the "metal soffit"
"metal soffit" on the perspective drawings from
on the elevation drawing. Include the
red to cream and beige, respectively. The use
color and manufacturer information in
of different colors minimizes the scale of the
the finish schedule.
corner tower roof elements. However, the
colors for these elements have not been
identified on the elevation drawings nor
included in the finish schedule.
2
There is a concern about the use of the
The spandrel glass in the upper area of the
Revise the south and east elevations to
spandrel glass, particularly in the upper
curved element of the south elevation has been
limit the use of spandrel glass to the
area of the curved element.
revised to vision glass. At the first story level
lower portion of the storefronts, as
on the south and east elevations, spandrel glass
proposed on the west elevation, or
is still proposed for all the doors and windows
redesign the elevations to achieve a
ARB Design Guideline
except for the two tower bays. This extensive
coordinated appearance using a
9. Building forms and features, including
use of spandrel glass only 35' from the road
combination of vision glass and other
roofs, windows, doors, materials, colors
will not have an appropriate appearance for the
appropriate design details. Submit a
and textures should be compatible with the
corridor. Spandrel glass storefronts are not
sample of the proposed spandrel glass.
forms and features of the significant
compatible with historic buildings in the area
historic buildings in the area, exemplified
(Guideline 9) and the spandrel glass does not
by (but not limited to) the buildings
successfully relieve the blankness of the fagade
described in Appendix B. The standard of
that was the original problem to be resolved.
compatibility can be met through scale,
materials, and forms which may be
In general, spandrel glass has been
embodied in architecture which is
approved for past projects in minimal amounts
contemporary as well as traditional. The
where vision glass is the dominant material.
replication of important historic sites in
However, spandrel glass, as opposed to vision
Albemarle County is not the objective of
glass, is proposed as the dominant glass
these guidelines.
material for the EC fagade in this application.
This would set an inappropriate precedent for
future new construction projects in the
Entrance Corridors.
On the west elevation and the south fagade of
REF
ARB COMMENT
ISSUES
RECOMMENDATION
the southwest corner tower, spandrel glass is
proposed only in the lower portion of the
windows. This use of spandrel glass may be
appropriate because it is limited to the lower
area of the storefront (which was historically
an opaque element). A sample of the proposed
spandrel glass has not been submitted, but is
required to make this determination.
3
Coordinate architectural elements and sign
Sign band areas have been identified on the
Revise the elevation drawings to show
areas.
elevation drawings; however, the EIFS sign
the width of the metal panels and the
band area has been widened to 3' -6" and the
EIFS sign band area on the hyphen
metal paneled area has been reduced from 1'-
sections of the building as the same
6" to 0' -6 ". This presents an uncoordinated
widths proposed in the drawings
appearance with the 1' -6" width of the metal
submitted for the 12/6/10 work
panels proposed in the corner towers. The
session.
previous 2' -6" width of the EIFS sign band
would adequately accommodate the proposed
1' -6" high channel letters shown on the
elevation drawings submitted on 12/13/10.
4
The issue of a sidewalk on the west side of
This recommendation has been provided to
None.
the building is not an EC issue. The ARB
Current Development.
recommends that the site plan be reviewed
for reasonable pedestrian access from
Route 250.
ARB Preliminary Review — 9/7/10
3
Revise the design of the dumpster
The color of the T -111 gate and board -on-
Revise sheet C9 to include the color
enclosure to include gates and provide a
board fence proposed for the dumpster
and manufacturer information for the
color for the fence and gate; a dark earth
enclosure has not been included on Sheet C9.
dumpster enclosure and gate. The
tone color would be appropriate.
The applicant has indicated that the color
proposed PMS 464C is appropriate.
would be PMS 464C.
5
Provide cutsheets, on full size sheets
The photometric plan shows three wall-
Coordinate the number and type of
inserted in the site plan package, for all
mounted W type light fixtures on the south
light fixtures proposed for the south
proposed site and exterior building
elevation and the elevation drawing shows six
elevation on the photometric plan and
lighting.
"Goose Neck" light fixtures. The applicant has
the elevation drawing.
indicated they want to propose six of the W
fixtures for the south elevation.
REF
ARB COMMENT
ISSUES
RECOMMENDATION
7
Revise the luminaire schedule to include
The height of the proposed site lighting is
Include a note on the photometric plan
the height of all proposed site lighting.
shown on the photometric plan, but no note
stating that all light pole heights
indicating whether the light fixtures are
include a 3' base except the two light
mounted on a base has been included. The
poles located directly in front of the
applicant has indicated that the 24' height
north fagade, which will be installed at
shown on the photometric plan includes a 3'
grade.
tall base. The two 24' high light fixtures
located closest to the north fagade would be
installed at grade. This is taller than the
guidelines recommend, but given the location
of the light poles at a lower elevation than the
front of the building, they are not anticipated to
be visible from the EC.
8
Provide evidence that all proposed
The applicant has provided this information;
Relocate the two Hornbeams at the
plantings are permitted in the
however, the Pyramidal European Hornbeams
southwest corner of the building and
Vepco /Centel/ACSA variable width utility
should be located a minimum of 10' from the
one at the southeast corner of the
easement or increase the planting area to
utility line to minimize potential conflict with
building to a minimum of 10' from the
accommodate the required plantings.
the line during maintenance.
utility line.
Also, the number of crapemyrtles shown on the
Coordinate the plan and landscape
plan does not match the number provided in
schedule to accurately show the
the landscape schedule.
number of crapemyrtles proposed on
the site.
11
With your next submission, provide a
Staff worked with the applicant to devise the
Confirm that the Comprehensive Sign
complete sign package including sign type,
Comprehensive Sign Review Criteria outlined
Review Criteria outlined in
dimensions, materials, method of
in Attachment C; however, the applicant has
Attachment C is being proposed as part
attachment, colors and type of illumination,
not yet confirmed that they are proposing the
of the application.
if any, for all visible building signage.
Criteria as part of the application. With the
Revise the wall sign proposal by
exception of the number of colors, these
Eliminate the following note from the
eliminating the sign proposed directly
criteria meet the sign guidelines. The sign
elevation drawing: "Tenant signs will
beneath the arched roof and reducing the
guidelines recommend the use of three colors
be internally lit channel letter on a
width of the sign below it so as not to
or less; however, the four colors proposed by
raceway. Color and text to be
overcrowd the sign band.
the applicant are coordinated and harmonious
determined by tenants."
with the proposed building.
ARB Design Guidelines
17e FThe following should be screened to
The standard note regarding mechanical
Add the following note to the site plan
REF
ARB COMMENT
ISSUES
RECOMMENDATION
eliminate visibility from the Entrance
equipment is not included in the site plan or
and architectural drawings: "Visibility
Corridor street:
architectural drawings.
of all mechanical equipment from the
a. Loading areas,
Entrance Corridor shall be eliminated."
b. Service areas,
c. Refuse areas,
d. Storage areas,
e. Mechanical equipment,
f. Above - ground utilities, and
g. Chain link fence, barbed wire, razor
wire, and similar security fencing
devices.
Staff recommends the following as the primary points of discussion:
1. The spandrel glass proposed on the south and east elevations.
2. The landscaping proposed along the EC.
Staff recommends approval of the Certificate of Appropriateness with the following conditions:
1. Identify the colors proposed for the roof fascia board and the "metal soffit" on the elevation drawing. Include the color and manufacturer
information in the finish schedule.
2. Revise the south and east elevations to limit the use of spandrel glass to the lower portion of the storefronts, as proposed on the west elevation, or
redesign the elevations to achieve a coordinated appearance using a combination of vision glass and other appropriate design details. Submit a
sample of the proposed spandrel glass.
3. Revise the elevation drawings to show the width of the metal panels and the EIFS sign band area on the hyphen sections of the building as the
same widths proposed in the drawings submitted for the 12/6/10 work session.
4. Revise sheet C9 to include the color and manufacturer information for the dumpster enclosure and gate. The proposed PMS 464C is appropriate.
5. 'Coordinate the number and type of light fixtures proposed for the south elevation on the photometric plan and the elevation drawing.
6. Include a note on the photometric plan stating that all light pole heights include a 3' base except the two light poles located directly in front of
the north fagade, which will be installed at grade.
7. Relocate the two Hornbeams at the southwest corner of the building and one at the southeast corner of the building to a minimum of 10' from the
utility line.
8. Coordinate the plan and landscape schedule to accurately show the number of crapemyrtles proposed on the site.
5
9. Confirm that the Comprehensive Sign Review Criteria outlined in Attachment C is being proposed as part of the application.
10. Eliminate the following note from the elevation drawing: "Tenant signs will be internally lit channel letter on a raceway. Color and text to be
determined by tenants."
11. Add the following note to the site plan and architectural drawings: "Visibility of all mechanical equipment from the Entrance Corridor shall be
eliminated."
Drawings Submitted for Analysis:
Sheet #
Drawing Name
Drawing Date/Revision Date
Cl — C9
Site Plan
10/25/10
CIO
Landscape Plan
11/4/10
Photometric Plan
11/8/10
2 -3
Lighting Cut Sheets
11/4/10
Elevation Drawing
Submitted 12/13/10
Color Rendering View of Southwest Corner and Southeast Corner Along Route 250
Submitted 12/13/10
Site Line Vantage Points
Submitted 11/8/10
Floor Plan
Submitted 10/25/10
Site Sections
Submitted 11 /10 /10
Roof Plan
Submitted 10/25/10
Materials Submitted:
• Metal Panel Sample, Firestone, Tropical Patina
• EIFS Sample, Senergy, Saddlesoap #3097
• Standing Seam Roof Sample, Peterson, Colonial Red
• Brick Sample, General Shale Brick, Monticello Flashed Range Colonial
0