Loading...
HomeMy WebLinkAboutSP201000045 Review Comments Special Use Permit 2010-12-31 (3)Megan Yaniglos From: Victoria Fort [vfort @rivanna.org] Sent: Monday, January 03, 2011 1:43 PM To: Megan Yaniglos Cc: Jennifer Whitaker; Justin Weiler Subject: Granger Special Use Permits Megan, RWSA requested additional information from Collins in the attached email sent 12/1/2010. We have not yet received their response, so we cannot fully assess the impacts on RWSA facilities. We will follow up with additional comments as soon as this information is available. Please let me know if you need anything more at this time. Victoria Victoria Fort, EIT Civil Engineer Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville, VA 22902 Phone: 434.977.2970 ext. 205 Fax: 434.295.1146 From: Victoria Fort [mailto:vfortCd)rivanna.oral Sent: Wednesday, December 01, 2010 4:55 PM To: 'Scott Collins'; 'Adam Long' Cc: Jwhitaker @rivanna.org'; 'jweiler @rivanna.org' Subject: RE: Collins ftp site Scott, Before RWSA can adequately review the changes to the Granger site, we request that the following elements be added to the plans: 1. Please show all available as -built information for the existing sewerline including manhole numbers, pipe sizes and materials, inverts (on profiles), etc. 2. Please show both the existing and proposed locations of the sewerline in the stream crossing profiles. (Sheet 2 of the Granger Stream Crossings Special Use Permits Plans) 3. Please include a profile of the proposed sewer relocation. 4. Please show the proposed RWSA sewerline easements requested in the last set of comments (60' along the length of the existing sewer and a rectangle extending from the property line of lot 1 to the VEPCO easement and 100' down from the railroad r /w) 5. Please remove the hatching (for the WPO 100' buffer /greenway) on the utility plans (Sheet 5 of 7) as it makes the drawing difficult to read. Please also correct the label on the upper left corner of that sheet that calls out the 100 - year flood plain as the 100' WPO buffer. 6. From a visit to the site, it is clear that the stream alignment shown on the plans no longer reflects existing field conditions. In particular, from the outlet of the box culvert (under the railroad) to Stribling Place, the flow of the stream appears to follow the RWSA sewer alignment. Also, how fixed is the road alignment shown in the plans? We were unsure whether this was dictated by the county or if there is some flexibility in its location. Please let me know about this and if you need any additional information from us. Also don't hesitate to contact me with any questions. Thanks, Victoria Victoria Fort, EIT Civil Engineer Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville, VA 22902 Phone: 434.977.2970 ext. 205 Fax: 434.295.1146