Loading...
HomeMy WebLinkAboutSDP201000055 Review Comments Final Site Plan and Comps. 2011-01-11Philip Custer From: Philip Custer Sent: Tuesday, January 11, 2011 11:13 AM To: Scott Collins; kirsten @collins - engineering.com; Adam Long; 'Justin Beights' Cc: Megan Yaniglos; Max Greene Subject: Conditional Engineering approval of Old Trail Block 4 (WPO- 2010 -00041 and SDP-2010-00055) Good Morning, Engineering has reviewed the latest submittal of the ESC and Site Plan for the Old Trail Village Block 4 (SDP- 2010 -00055 and WPO- 2010 - 00041), received 7 January 2011. The plan has addressed all outstanding engineering comments except for the widening of the parallel parking spaces to the ordinance standard of 9ft, approval of the road plans, and the payment of the pro -rata fee for use of the Lickinghole Basin (SWM quality). The site plan cannot be approved until the parallel parking spaces are corrected, approval of the road plans is granted, and the payment of the Lickinghole Basin fee is received. The Lickinghole basin pro -rata fee will be calculated next week when the averaged Consumer Price Index for 2010 has been established. This fee must be paid to the County prior to the approval of the site plan. Conditional approval to the ESC plan is hereby given (see the outstanding issues above). Engineering review requires 3 more copies of the plan so the file can be prepared to pass off to the ESC inspector. (Additional copies of the plan will be requested by Megan once the site plan can be approved.) To request an ESC bond, please submit a completed Bond Estimate Request Form to the County Engineer. The ESC bond must be posted prior to the issuance of a grading permit. A grading permit cannot be given until the site plan is approved. To post the ESC bond or pay the pro -rata fee for the use of the Lickinghole Basin, please contact Ana Kilmer at 296 -5832 x3246. Please let me know if you have any questions regarding the engineering review of this project. Thanks, Phil 296 -5832 x3072