Moores Creek Pump Station Improvements— WP0201000066
Matthew D. Buswell, P.E.
[mbuswell @ hazenandsawyer. com]
Rivanna Water & Sewer Authority Moore Creek
18 October 2010
8 December 2010
27 January 2011
3 November 2010
18 January 2011
2 February 2011
John P. Diez — Engineering Technician
A. Erosion and Sediment Control Plan
1. All erosion and sediment control measures must be within the limits of disturbance. This includes
the construction staging and stockpile area. Please revise.
(Rev. 1) Comment has not been addressed. Inlet protection inlets must be within the limits of
disturbance.
(Rev. 2) Comment has been addressed.
2. Please provide details for the turbidity curtain. Please refer to the Virginia Erosion and Sediment
Control Handbook, section 3.27.
(Rev. 1) Comment has been addressed.
3. Please provide a Utility Stream Crossing (USC) on Moores Creek. Please refer to the Virginia
Erosion and Sediment Control Handbook, section 3.25.
(Rev. 1) Comment has been addressed..
4. (Rev. 1) Comment has been addressed.
5. Please provide a construction sequence.
(Rev. 1) Please disregard comment.
You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246
for further information on bonding procedures. Please find the Bond Estimate Request Form at
hqp://www.albemarle.org/deptforms.asp?department=bonds
Once the E &SC bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
\\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000066 - Moores Creek Pump Station Improvement \CDE3_esc_JPD_Moores
Creek Pump Station Improvements. doe