Loading...
HomeMy WebLinkAboutWPO201000066 Review Comments Erosion Control Plan 2011-02-02OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Rev 1: Rev 2: Date of comments: Rev 1: Rev 2: Reviewer: Moores Creek Pump Station Improvements— WP0201000066 Matthew D. Buswell, P.E. [mbuswell @ hazenandsawyer. com] Rivanna Water & Sewer Authority Moore Creek 18 October 2010 8 December 2010 27 January 2011 3 November 2010 18 January 2011 2 February 2011 John P. Diez — Engineering Technician A. Erosion and Sediment Control Plan 1. All erosion and sediment control measures must be within the limits of disturbance. This includes the construction staging and stockpile area. Please revise. (Rev. 1) Comment has not been addressed. Inlet protection inlets must be within the limits of disturbance. (Rev. 2) Comment has been addressed. 2. Please provide details for the turbidity curtain. Please refer to the Virginia Erosion and Sediment Control Handbook, section 3.27. (Rev. 1) Comment has been addressed. 3. Please provide a Utility Stream Crossing (USC) on Moores Creek. Please refer to the Virginia Erosion and Sediment Control Handbook, section 3.25. (Rev. 1) Comment has been addressed.. 4. (Rev. 1) Comment has been addressed. 5. Please provide a construction sequence. (Rev. 1) Please disregard comment. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures. Please find the Bond Estimate Request Form at hqp://www.albemarle.org/deptforms.asp?department=bonds Once the E &SC bond has been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. \\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000066 - Moores Creek Pump Station Improvement \CDE3_esc_JPD_Moores Creek Pump Station Improvements. doe