HomeMy WebLinkAboutWPO201000070 Review Comments Erosion Control Plan 2011-02-07� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: National College (WPO- 2010 - 00070) Re: Minimum Standard 19 (Adequate Channel) Calculations Plan preparer: Mr. John Hash, PE, Timmons Group Owner or rep.: Corolla Management Corporation Plan received date: 28 December 2010 Date of comments: 7 February 2011 Reviewer: Phil Custer, Current Development Engineering This memo is being written to provide comments regarding the adequate channel calculations for National College. The second submittal of the plan had been reviewed with comments provided February 2nd. However, the adequate channel information on Sheet C6.3 was overlooked. Please consider this comment letter an addendum to John Diez's 2 °a review comment letter. Please provide detailed calculations for the MS -19 analysis on channel adequacy. Please refer to the Virginia Erosion and Sediment Control Handbook for proper guidelines. (Rev. 1) The adequate channel calculations provided by the applicant are not sufficient. The following comments are provided. a. The channel sections provided by the applicant indicate constructed man -made ditches. I could not find any instance along this natural channel that matched any of these cross - sections. Analyses of irregular channel cross - sections with varying permissible velocity, allowed velocity, and n -value for each segment across the cross - section are necessary. These calculations can be done iteratively by hand or through a computer program. If you do not have a program that will do this calculation, I can provide you with a basic one created by the County Engineer, Glenn Brooks. b. No analysis of the 24" culvert was provided. It appears that this culvert may cross Route 29 independently, without mixing with the drainage system of the shoulder and median ditches. On my site visit last week, I noticed that the 24" culvert did not connect to the median structure. I was unable to confirm whether the structure south of the entrance to JW Townsend was also separate from the 24" culvert. c. There is no channel 120ft from the outlet of the detention system. It looks as though there might have been a culvert placed in this location which was clogged by debris and silted over. This is causing considerable problems on the downhill side of the culvert where there is rapid erosion in the stream. After reviewing this section of the stream especially, there does not appear to be an existing adequate channel downstream of development. Some work appears to be needed on the adequate property. An alternative could be providing much more detention onsite. d. Please note that the 1% rule is not reached until 350ft downstream of the outlet of the Route 29 culvert where the stream intersects Flat Branch. In an earlier conversation with the applicant, County staff stated they would not require a detailed analysis east of the Route 29 culvert. e. Please show the stationing on a plan view drawing so the location of the cross - sections Albemarle County Community Development Engineering Review Comments Page 2 of 2 can be more easily identified. f. The profile centerline on C6.3 appears to be located outside of the stream. 2-7-20 1 1 MS -19 Mcmo national colleac.doc