HomeMy WebLinkAboutSDP200900067 Review Comments Preliminary Site Plan 2011-03-18vIRGIN�
County of Albemarle
Department of Community Development
Memorandum
To: Summer Frederick, Senior Planner
From: Amy Pflaum, Engineering Review
Rev. 1: John Diez
Division: Current Development
Date: September 14, 2009
Rev. 1: June 22, 2010
Rev. 2: October 8, 2010
Rev. 3: March 18, 2011
Subject: SDP200900067, Crozet Library - Preliminary Site Plan
The preliminary site plan for the Crozet Library, submitted on February 16, 2011, has been reviewed.
Current Development Engineering can recommend approval once the following comments have been
addressed:
General Site Plan Comments
Please add a note to Sheet 1 stating that this property is in the Lickinghole Creek Watershed [18-
32.5.6.f].
(Rev. I) Comment has been addressed.
2. Each development shall be provided with safe and convenient ingress from and egress to one or
more public roads. Without the completion of the New Main Street project, this proposed
development has no vehicular entrance. [18- 32.7.2]
(Rev. I) Comment has been acknowledged.
3. The Downtown Crozet District zoning requires new sidewalks on Crozet Avenue and New Main
Street to be 10 -feet wide [18- 20B.7.A]. Although this proposal states that the sidewalk will be
built with a different project, this proposal must accommodate the required width or seek a waiver
of the Ordinance. The applicant may request a waiver of the width requirement under the
provision in 18- 2013.7.1), this is an administrative waiver to the Chief of Current Development.
(Rev. I) Comment has been acknowledged.
4. In several locations on the plan, proposed contours do not tie back into existing contours correctly,
please revise. [18- 32.5.6.d]
(Rev. I) Comment has been addressed. However, please state on Sheet 4.2 of the Final Site
Plan that "Existing contours on this sheet refer to the proposed contour lines from Sheet 4.0"
(Rev. 2) Comment has been addressed.
5. The minimum dimensions of a dumpster pad are 18' deep by 10' wide. The concrete paving 8 feet
in front of the dumpster pad must meet the same strength requirements as the pad. [18- 4.12.19]
(Rev. I) Comment has been addressed.
6. Please show sight distance triangles at the new entrance. [18- 4.12.17.b]
(Rev. I) Comment has been addressed.
It is unclear from the proposed grading if an adequate landing of 40 feet at no greater than 4%
slope has been designed at the proposed entrance onto New Main Street. The cross -slope on this
entrance appears to be severe. [18- 4.12.17.b]
(Rev. I) Comment has not been addressed.
(Rev. 2) Comment has not been addressed. The existing contours on sheet C4.2 still do much
match the proposed contours on sheet C4.0. Please revise.
(Rev. 3) Comment has been addressed. Applicant has removed Phase M of the project.
8. Please show location of the new rights -of -way of Crozet Avenue and New Main Street, or show
the easements necessary for access, road and sidewalk maintenance. [18- 32.5.6.i]
(Rev. I) Comment has been addressed.
9. Without the completion of the New Main Street and Crozet Streetscape projects, this proposed
development lacks the infrastructure necessary for storm sewer outfall. An adequate channel
would need to be graded from the point of release to the roadside ditch of Crozet Avenue.
(Rev. I) Comment has been acknowledged.
Stormwater Management Comments (for information purposes only)
irre proposea vc8rv,,ar JLV111rWaLG4 ivlarra8c111crrL l Q1.111Ly, as a t..onstructed Wetland, will have a
pollutant removal rate of approximately 30 %. This is significantly lower than the required
removal rate for a site with a proposed impervious area of 81% of the parcel. To meet the removal
rate, an on -site BMP would be required; however, this property is in the Lickinghole Basin
drainage area which provides for the area's water quality management. [17- 316(B)]
(Rev. I) Comment has been acknowledged.
11. It has not been determined what the storage capability of the Regional Stormwater Management
Facility will be. To meet the requirements of the Water Protection Ordinance, Section 17 -314
Control of Peak Rate and Velocity Runoff, on -site detention may be required.
(Rev. I) The final site plan for this project cannot be approved until on -site detention is
provided OR the Board of Supervisors approves the creation of a SWM district in Downtown
Crozet and exempts those properties from detention requirements.
I" ___ " Comment has been addrr ,nd.
Final Site Plan comments (for information purposes only)
1/-. iumpulcuy giauirrg arru Lv116L1UUuuu ua6u uflLS will ee necessary from TMP's 56A2-1-12,56A2-
1-13, 56A2 -1 -14, and 56A2 -1 -15.
(Rev. I) Comment has been acknowledged.
13. If the building site and the parking lot are to be graded at the same time, very little room is left at
the lower elevations of the parcel for erosion and sediment control measures. Please take this into
consideration when designing for E &S.
(Rev. I) Comment has been acknowledged.
\\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900067 Crozet Library - Pre1im \CDE4_psp_JPD_09 -00067 Crozet Library Prelim.doc