Loading...
HomeMy WebLinkAboutSDP201000078 Review Comments Final Site Plan and Comps. 2011-05-09ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Date received: Date of Comment: Engineer: SDP - 2010 - 00078, HTC Apartments Site Plan Mr. Scott Collins, PE; Collins Engineering Uptown Village, LLC 8 March 2011 9 May 2011 Phil Custer The second submittal of the Hollymead Towncenter Apartments site plan, received on 8 March 2011, has been reviewed. The following comments are provided: 1. During the review of the preliminary site plan, it was stated that the project met the threshold for requiring a VDOT 527 traffic analysis. A traffic analysis was not provided at the preliminary stage, which is normally customary. Instead, the preliminary site plan was approved on the condition that a traffic analysis be submitted and approved prior to final site plan approval. This traffic study has not yet been submitted. Before submitting a traffic study, the applicant will need to meet with the county and VDOT for a scoping meeting. 2. It is my understanding that the ROW for Towncenter Drive and other easements have been dedicated since the last submittal. Please show the deedbook and pages numbers for the dedication and easements in the site plan. [18- 32.5.6.1, j, k, and 1] 3. The site plan cannot be approved until the WPO plans are approved. Only one review has been performed on the WPO plan. A comment response letter to the WPO plan review written by the applicant was provided with the site plan resubmittal, but no fee was accompanying it. The county had contacted the applicant and they have elected not to have a WPO review performed by not providing the required review fee. 4. Engineering review is concerned with the high velocities at the end of the 24" drainage system from the site. The outlet velocity will likely wash out the riprap placed on the steep slope in the forebay. Please make a deeper drop manhole right before the outlet into the forebay or grout the riprap to prevent washout. File: E2_fsp_PBC_SDP- 2010 -00078 HTC Apartments Site Plan.doc