HomeMy WebLinkAboutWPO201100020 Review Comments Mitigation Plan 2011-04-12� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Merifield Farms — E &S and Mitigation Plan [WP0201100020]
Plan preparer: Brian Smith, P.E. [bpspe @embargmail.com]
Owner or rep.: Woodriff, Jaffray P or Merrill Saunton W.
Plan received date: 18 March 2011
Date of comments: 12 April 2011
Reviewer: John P. Diez — Current Development - Engineering Technician
A. Erosion & Sediment Control plan (WP0201100020)
1. Please provide a staging and parking area.
2. Please provide culvert inlet protection (CIP) on all existing and proposed culverts.
3. The riser anchor specifications must be shown of the sediment basin details.
4. Access to the sediment basin must be shown or a second construction entrance must be provided
for the separate limits of disturbance. Alternatively, the sediment basin can be included in the first
limits of disturbance.
5. Please extend the silt fence on sheet C 1.0 up to around station 76 +00.
6. It appears that not all area of disturbance are included in the drainage areas on sheet C2.2 and
C2.3. Please revise.
On sheet C2.3, please change from SB #2 to SB #1.
It appears that the invert-in for the riser is incorrect. Please revise.
9. Plans must be signed and sealed prior to plan approval.
Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations,
and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these
review comments. Please contact John Diez at 434 - 296 -5832 orjdiez@albemarle.org to schedule an
appointment.
If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email:
jdiez @ albemarle. or ,a.
\\ Cob- dts01 \cityviewlnk\Docs \2011 \WPO \WPO201100020 - Merifield Farms \CDE1- esc_mit_JPD_Merifie1d Fanns.doc