Loading...
HomeMy WebLinkAboutARB201100010 Review Comments Miscellaneous Submittal 2011-04-01ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 1, 2011 Buddy Spencer and /or Jennifer Arrington WW Associates Inc. 3040 Avemore Square Place Charlottesville, VA 22911 RE: ARB- 2011 -10: North Pointe Stormwater Management Facilities #10 & #11 Dear Mr. White, I have reviewed your recent submittal for the above - referenced project, which included Sheets 1 -4 of 7 dated 3 -4 -11 and a Celtik Wall catalog sheet with the following colors noted: Edenburg Red, Highland Brown, Oxford Charcoal and Shefield Beige - Black. The revisions made in these drawings address the conditions of ARB approval outlined at the March 7, 2011 meeting. You may consider this letter your Certificate of Appropriateness for the design of stormwater facilities #10 and #11. This approval is granted with the following conditions: 1. Chain link fencing shall not be used within 500' of the Entrance Corridor street. No chain link is approved for facility #11. A decorative, black chain link fence is approved for facility #10 only at the tops of the three retaining walls located to the east of that facility. 2. Any additional fencing requires ARB review and approval. Any safety fencing required within 500' of the Entrance Corridor street shall follow the design criteria previously established by the ARB. Chain link fence may be acceptable beyond 500' with appropriate screening, subject to ARB review and approval. 3. The approval that is the subject of this letter applies only to stormwater facilities #10 and #11. Separate ARB review and approval are required for the remainder of the Northwest Residential Area. Appropriate coordination between the stormwater facility designs and the overall Northwest Residential Area design will be required. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: Neighborhood Investments - NP LLC, P O Drawer R, Charlottesville VA 22903 Gerald Gatobu, Current Development (via email)