Loading...
HomeMy WebLinkAboutSUB200900062 Review Comments Road Plan and Comps. 2011-04-26Philip Custer From: Philip Custer Sent: Tuesday, April 26, 2011 6:36 PM To: 'Frank Pohl'; 'Vito Cetta' Cc: Ana Kilmer; Gerald Gatobu Subject: Engineering approval of the construction set for Wickham Pond Phase II Block 1 (WPO- 2010 -00058 and SUB - 2009 - 00092) Good evening, Engineering has reviewed the latest submittals of the ESC, SWM, road plans for the Wickham Pond Phase II Block 1 project (SUB- 2009 -00092 and WPO- 2010 - 00058), received 1 April 2011 (with supplemental sheets submitted via email since). All technical comments have been addressed and the plans are hereby approved. The road, esc, and stormwater bonds have been computed. The ESC bond is $107,800. The SWM bond is $169,600. The road bond is $847,100. To post any of these bonds, please contact Ana Kilmer. Engineering review will need the following sets to pass of to the county inspectors before the grading permit is issued: 5 sets of the ESC /SWM plan, 2 sets of the Road Plan, and 2 copies of sheets 1, 5, and 6 of the road plan set ( "overlot grading plan "). A grading permit for this project cannot be issued until the three offsite easements (56 -91B, 56J -A, and 56J -1 -1) are recorded. If these easements are to be granted with the final plat, all bonds will need to be posted prior to county signature. If these easements are granted with a plat separate from the final plat, only the ESC and SWM bonds will need to be posted. Please contact me if you have any questions. Thanks, Phil 296 -5832 x3072