Loading...
HomeMy WebLinkAboutSUB200900062 Review Comments Road Plan and Comps. 2011-04-19Philip Custer From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Tuesday, April 19, 2011 12:11 PM To: Philip Custer Subject: RE: Wickham Phase II WPO- 2007 -00017 Phil, I think everything has been addressed. Frank sent a small revision to me for the intersection that looks fine. I also discussed the issue that you had pointed out to me on that curve that has a radius of 111 feet. He is going to be able to straighten that out. So that should all take care of it. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 joel.denunzio @vdot.virginia.gov From: Philip Custer [mailto:pcuster @albemarle.org] Sent: Monday, April 18, 2011 6:45 PM To: DeNunzio, Joel D., P.E. Subject: RE: Wickham Phase II WPO- 2007 -00017 Have all of your comments for Wickham Pond Phase II been addressed? From: Frank Pohl [mailto :frank @pohlconsultingllc.com] Sent: Friday, March 18, 20112:44 PM To: Joel DeNunzio, P.E.; Philip Custer Cc: 'Vito Cetta' Subject: RE: Wickham Phase II WPO- 2007 -00017 Joel, Attached are the affected drawings. I added the strip along the edge of pavement on each side of the entrance as requested (sheet R -6) and removed the Filterra Units in the plans where it was showing up. One remaining question, do you want me to delete the Filterra details from sheet 17 at this time? Or wait for my final submittal? Or, if you don't need the stormwater calculations, I can remove this entire sheet from the list of drawings. Thanks, Frank From: DeNunzio, Joel D., P.E. [ mailto:J oel.DeNunzio @VDOT.virginia.gov] Sent: Friday, March 18, 20118:30 AM To: Frank Pohl; Philip Custer Cc: Vito Cetta; Ana Kilmer Subject: RE: Wickham Phase II WPO- 2007 -00017 Frank, You can just send me the pdf since I think the striping is only on one or two sheets. Thanks Joel - - - -- Original Message---- - From: Frank Pohl [mailto:frank @pohlconsultin 11�] Sent: Thu 3/17/20115:31 PM To: DeNunzio, Joel D., P.E.; 'Philip Custer' Cc: 'Vito Cetta'; 'Ana Kilmer' Subject: RE: Wickham Phase II WPO- 2007 -00017 Thank you Joel for the comments. Phil, I think we already have a maintenance agreement in place. Can you confirm this or should I check with Ana Kilmer on this? My understanding is the existing agreement includes all stormwater facilities on the property. I have copied Ana on this email. However, if it doesn't and another one is needed to address these specifically, please just let me know and we will get it done. I'll add the striping and resubmit as soon as possible in a PDF along with the hard copies as soon as Phil is finished reviewing. Thanks, Frank From: DeNunzio, Joel D., P.E. [mailto:Joel.DeNunzio @VDOT.vir ig nia.gov] Sent: Thursday, March 17, 20112:54 PM To: Philip Custer Cc: Frank Pohl Subject: FW: Wickham Phase II WPO- 2007 -00017 Phil, I have reviewed the referenced plan and have the following comments: 1. The proposed Filterra units will need to have a maintenance agreement between Albemarle County and VDOT to permit the units within the right of way. A sample agreement can be found at the VDOT website under the SSAR Regulations. 2. Pavement striping along the outside edge of Route 240 for the right turn lane needs to be added to the plan on both sides of the proposed entrance. 3. A Land Use Permit issued by VDOT needs to be acquired prior to any construction within the Route 240 right of way. Please let me know if you have any questions or comments. Thanks Joel From: Denunzio, Joel D., P.E. Sent: Wednesday, September 19, 2007 11:58 AM To: 'Allan Schuck' Subject: FW: Wickham Phase II WPO- 2007 -00017 Allan, We have received the revised sheets and all of our comments have been addressed. A permit will be required for work within the VDOT ROW and can be obtained from my office. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 < mailto :joel.denunzio @VirginiaDOT.org> joel.denunzio @VirginiaDOT.org From: Denunzio, Joel D., P.E. Sent: Wednesday, July 18, 2007 9:08 AM To: 'Allan Schuck' Subject: Wickham Phase II WPO- 2007 -00017 Wickham Phase II WPO- 2007 -00017 Allan, I reviewed the latest Wickham II plan and have a couple small items: In the June 15th reply, #9 says that Wickham Place station 10 +00 to 15 +00 and 22 +00 to the end are 25 mph. The plans look like 22 +00 to the end is 20 mph and I think that 20 mph for this section is correct. Please verify these speeds for me. The right turn lane east of the proposed entrance has the curb and gutter coming out to route 240 and making a 9 foot turn lane. Both the thru lane and the turn lane need to be 11 feet. It actually looks like we need a small amount of pavement widening here for the lanes to be correct. No changes are necessary for the first comment other than verifying the design speeds. The second comment only applies to sheets 4, 6, 8, and 13. I don't need an entire new set of plans. These sheets can be revised and sent to me and I will insert them into the plan set. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 < mailto :joel.denunzio @VirginiaDOT.org> joel.denunzio @VirginiaDOT.org