Loading...
HomeMy WebLinkAboutSDP201100009 Review Comments Preliminary Site Plan 2011-05-02`J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: Megan Yaniglos FROM: Alexander J. Morrison, Civil Engineer DATE: April 22, 2011 RE: Site Plan Technical Review for: SDP201100009- Belvedere Town Center- Preliminary The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 8 inch water line is located approximately (ON PROPERTY) distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately 151' distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • No manholes in parking areas. • Dedication of Phase 1, Block 3, 4A, 5A, 6B & 9A infrastructure is required prior to final site plan approval. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org