TO: Megan Yaniglos
FROM: Alexander J. Morrison, Civil Engineer
DATE: April 22, 2011
RE: Site Plan Technical Review for: SDP201100009- Belvedere Town Center- Preliminary
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓
2.
An 8 inch water line is located approximately (ON PROPERTY) distant.
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓
4.
An 8 inch sewer line is located approximately 151' distant.
5.
An Industrial Waste Ordinance survey form must be completed.
✓
6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
✓
10.
Final water and sewer plans are required for our review and approval prior to
granting tentative approval.
11.
Final site plan may /may not be signed.
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
• No manholes in parking areas.
• Dedication of Phase 1, Block 3, 4A, 5A, 6B & 9A infrastructure is required prior to final site
plan approval.