HomeMy WebLinkAboutSUB200900062 Review Comments Bond Estimate 2011-06-02Wickham Pond Phase II Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed % compete cost remaining Wickham Place 10 +00 to 15 +00 road length 500.0 ft 1 aggregate base 4.0 in d 500.0 ft L 30.1 ft W (average) 185.8 cy $35.91 $6,672.17 0% $6,672.17 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 6.0 in d 500.0 ft L 30.1 ft W (average) 421.4 tons $73.50 $30,972.90 0% $30,972.90 4 asphalt surface 1.5 in d 500.0 ft L 30.1 ft W (average) 105.4 tons $81.90 $8,628.17 0% $8,628.17 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 960.0 ft $13.83 $13,275.36 0% $13,275.36 8 sidewalk, asphalt 0.0 in d ft L ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4'width 960.0 ft $11.66 $11,188.80 0% $11,188.80 10 ramp CG -12 4 $315.00 $1,260.00 0% $1,260.00 11 street name sign 2 $65.00 $130.00 0% $130.00 12 traffic control sign 3 $49.35 $148.05 0% $148.05 13 Street Landscape 0Each 22 $105.00 $2,310.00 0% $2,310.00 13 guardrail 0ES 0 $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 4 $1,365.00 $5,460.00 0% $5,460.00 16 pipe, rep (15 to 48 ") 24.0 in d 1 ES -1,2 $250 EC -1 $200 142.0 ft $39.90 $5,915.80 0% $5,915.80 17 pipe, rep (15 to 48 ") 15.0 in d 0 ES- 1,2$250 0 EC -1 $200 75.0 ft $23.10 $1,732.50 0% $1,732.50 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (percyforcut or import only 0.0 cy fill 0.0 cy out 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per mad) 500.0 ft L 1 inc of 500' 2 $157.50 $315.00 0% $315.00 25 as -built drawings (1k +price per 0.1 500.0 ft 0.095 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 500.0 ft L 0.095 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 500.0 ft L 0.095 mi. 2 Lanes $2,000.00 $3,787.88 0% $3,787.88 29 VDOT maintenance fee (1 In rd, 1 yr) 500.0 ft L 0.095 mi. 2 Lanes $150.00 $284.09 0% $284.09 30 VDOT admin. Cost recovery fee(1 Iar 500.0 ft L 0.095 mi. 2 Lanes $100.00 $439.39 0% $439.39 $96,620.11 $96,620.11 Wickham Place 15 +00 to 21 +82.74 road length 682.8 ft 1 aggregate base 8.0 in d 682.8 ft L 25.0 ft W 421.5 cy $35.91 $15,135.18 0% $15,135.18 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 0.0 in d 682.8 ft L 0.0 ft W 0.0 tans $73.50 $0.00 0% $0.00 4 asphalt surface 2.0 in d 682.8 ft L 25.0 ft W 159.3 tans $81.90 $13,048.12 0% $13,048.12 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 1290.0 ft $13.83 $17,838.77 0% $17,838.77 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 1290.0 ft $11.66 $15,034.95 0% $15,034.95 10 ramp CG -12 4 $315.00 $1,260.00 0% $1,260.00 11 street name sign 2 $65.00 $130.00 0% $130.00 12 traffic control sign 4 $49.35 $197.40 0% $197.40 13 Street Landscape 33 Each 33 $105.00 $3,465.00 0% $3,465.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 7 $1,365.00 $9,555.00 0% $9,555.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 501.0 ft $23.10 $11,573.10 0% $11,573.10 17 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 194.0 ft $27.30 $5,296.20 0% $5,296.20 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 tan $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 1024.2 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (percyforcut or import only 0.0 cy fill 0.0 cy cut 0.0 cy be] $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 682.8 ft L 1.366 inc of 500' 2 $157.50 $378.00 0% $378.00 25 as -built drawings(1k +price per 0.1 682.8 ft 0.129 mi. 2 $1,050.00 $3,100.00 0% $3,100.00 26 survey and layout (price per 0.1 mi.) 682.8 ft L 0.129 mi. 2 $525.00 $2,050.00 0% $2,050.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 682.8 ft L 0.129 mi. 2 Lanes $2,000.00 $5,172.65 0% $5,172.65 29 VDOT maintenance fee (1 In rd, 1 yr) 682.8 ft L 0.129 mi. 2 Lanes $150.00 $387.95 0% $387.95 30 VDOT admin. Cost recovery fee(1 Iar 682.8 ft L 0.129 mi. 2 Lanes $100.00 $508.63 0% $508.63 $104,655.94 $104,655.94 Chesi Circle 10 +00 to13 +06.13 road length 306.1 ft 1 aggregate base 8.0 in d 306.1 ft L 18.0 ft W 136.1 cy $35.91 $4,885.83 0% $4,885.83 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 0.0 in d 306.1 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 4 asphalt surface 2.0 in d 306.1 ft L 18.0 ft W 51.4 tons $81.90 $4,212.10 0% $4,212.10 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 570.0 ft $13.83 $7,882.25 0% $7,882.25 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4'width 360.0 ft $11.66 $4,195.80 0% $4,195.80 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 4 $49.35 $197.40 0% $197.40 13 Street Landscape 13 Each 13 $105.00 $1,365.00 0% $1,365.00 13 guardrail 0ES 0 $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 6 $1,365.00 $8,190.00 0% $8,190.00 16 pipe, rep (15 to 48 ") 15.0 in d 0 ES- 1,2$250 0 EC -1 $200 76.3 ft $23.10 $1,761.38 0% $1,761.38 17 pipe, rop (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 89.4 ft $27.30 $2,441.71 0% $2,441.71 17A pipe, rcp (15 to 48 ") 24.0 in d 0 ES -1,2 $250 0 EC -1 $200 168.4 ft $39.90 $6,720.76 0% $6,720.76 17B pipe, rcp (15 to 48 ") 30.0 in d 1 ES -1,2 $250 1 EC -1 $200 177.4 ft $63.00 $11,623.05 0% $11,623.05 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 6/3/2011 Wickham Pond Phase II Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed % compete cost remaining 21 rip -rap, placed tan $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 ft L ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (far wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (percyforcut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 306.1 ft L 0.612 inc of 500' 2 $157.50 $267.75 0% $267.75 25 as -built drawings (1k +price per 0.1 306.1 ft 0.058 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 306.1 ft L 0.058 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 306.1 ft L 0.058 mi. 2 Lanes $2,000.00 $2,319.17 0% $2,319.17 29 VDOT maintenance fee (1 In rd, 1 yr) 306.1 ft L 0.058 mi. 2 Lanes $150.00 $173.94 0% $173.94 30 VDOT admin. Cost recovery fee(1 Iar 306.1 ft L 0.058 mi. 2 Lanes $100.00 $365.96 0% $365.96 $60,767.09 $60,767.09 Delila Drive 21 +82.79 to 24 +0( road length 217.2 ft 1 aggregate base 8.0 in d 217.2 ft L 20.0 ft W 107.3 cy $35.91 $3,851.86 0% $3,851.86 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 0.0 in d 217.2 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 4 asphalt surface 2.0 in d 217.2 ft L 20.0 ft W 40.5 tons $81.90 $3,320.71 0% $3,320.71 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 360.0 ft $13.83 $4,978.26 0% $4,978.26 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4'width 360.0 ft $11.66 $4,195.80 0% $4,195.80 10 ramp CG -12 2 $315.00 $630.00 0% $630.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 3 $49.35 $148.05 0% $148.05 13 Street Landscape 39 Each 8 $105.00 $840.00 0% $840.00 13 guardrail 0ES 0 $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 4 $1,365.00 $5,460.00 0% $5,460.00 16 pipe, rep (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 17 pipe, rep (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 67.4 ft $27.30 $1,840.84 0% $1,840.84 17A pipe, rep (15 to 48 ") 24.0 in d 0 ES -1,2 $250 0 EC -1 $200 135.8 ft $39.90 $5,416.43 0% $5,416.43 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (percyforcut or import only 0.0 cy fill 0.0 cy out 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per mad) 217.2 ft L 0.434 inc of 500' 2 $157.50 $236.25 0% $236.25 25 as -built drawings (1k +price per 0.1 217.2 ft 0.041 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 217.2 ft L 0.041 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 217.2 ft 0.041 mi. 2Lanes $2,000.00 $1,645.53 0% $1,645.53 29 VDOT maintenance fee (1 In rd, 1 yr) 217.2 ft L 0.041 mi. 2 Lanes $150.00 $123.41 0% $123.41 30 VDOT admin. Cost recovery fee(1 Iar 217.2 ft L 0.041 mi. 2 Lanes $100.00 $332.28 0% $332.28 $37,184.41 $37,184.41 Wickham Way 10 +00 to 11 +40.0( road length 140.0 ft 1 aggregate base 4.0 in d 140.0 ft L 24.0 ft W 41.5 cy $35.91 $1,489.60 0% $1,489.60 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 3.5 in d 140.0 ft L 24.0 ft W 54.9 tans $73.50 $4,033.68 0% $4,033.68 4 asphalt surface 1.5 in d 140.0 ft L 24.0 ft W 23.5 tans $81.90 $1,926.29 0% $1,926.29 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 180.0 ft $13.83 $2,489.13 0% $2,489.13 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 180.0 ft $11.66 $2,097.90 0% $2,097.90 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 2 $65.00 $130.00 0% $130.00 12 traffic control sign 2 $49.35 $98.70 0% $98.70 13 Street Landscape 6Each 6 $105.00 $630.00 0% $630.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 2 $1,365.00 $2,730.00 0% $2,730.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 75.7 ft $23.10 $1,749.36 0% $1,749.36 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 tan $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (far wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 140.0 ft L 0.28 inc of 500' 1 $157.50 $204.75 0% $204.75 25 as -built drawings (1k +price per 0.1 140.0 ft 0.027 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 140.0 ft L 0.027 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 140.0 ft L 0.027 mi. 2 Lanes $2,000.00 $1,060.61 0% $1,060.61 29 VDOT maintenance fee (1 In rd, 1 yr) 140.0 ft L 0.027 mi. 2 Lanes $150.00 $79.55 0% $79.55 30 VDOT admin. Cost recovery fee(1 Iar 140.0 ft L 0.027 mi. 2 Lanes $100.00 $303.03 0% $303.03 $23,122.59 $23,122.59 Allyn Alley 10 +00 to 16 +01.3' road length 601.3 ft 1 aggregate base 8.0 in d 601.3 ft L 15.0 ft W 222.7 cy $35.91 $7,997.82 0% $7,997.82 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 0.0 in d 601.3 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 4 asphalt surface 2.0 in d 601.3 ft L 15.0 ft W 84.2 tons $81.90 $6,894.96 0% $6,894.96 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 0.0 ft $13.83 $0.00 0% $0.00 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 4' width 0.0 ft $11.66 $0.00 0% $0.00 6/3/2011 Wickham Pond Phase II Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed % compete cost remaining 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 2 $49.35 $98.70 0% $98.70 13 Street Landscape 0 Each 0 $105.00 $0.00 0% $0.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 5 $1,365.00 $6,825.00 0% $6,825.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 319.7 ft $23.10 $7,384.84 0% $7,384.84 17 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 83.3 ft $27.30 $2,273.82 0% $2,273.82 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 tan $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (far wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 0.0 cy fill 0.0 cy cut 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per road) 601.3 ft L 1.203 inc of 500' 2 $157.50 $362.25 0% $362.25 25 as -built drawings (1k +price per 0.1 601.3 ft L 0.114 mi. 2 $1,050.00 $3,100.00 0% $3,100.00 26 survey and layout (price per 0.1 mi.) 601.3 ft L 0.114 mi. 2 $525.00 $2,050.00 0% $2,050.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 601.3 ft L 0 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 601.3 ft L 0 mi. 0 Lanes $150.00 $0.00 0% $0.00 30 VDOT admin. Cost recovery fee(1 Iar 601.3 ft L 0 mi. 0 Lanes $100.00 $0.00 0% $0.00 $37,577.39 $37,577.39 Turn Lane road length 375.0 ft 1 aggregate base 4.0 in d 375.0 ft L 12.0 ft W 55.6 cy $35.91 $1,995.00 0% $1,995.00 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 6.0 in d 375.0 ft L 12.0 ft W 126.0 tons $73.50 $9,261.00 0% $9,261.00 4 asphalt surface 1.5 in d 375.0 ft L 12.0 ft W 31.5 tons $81.90 $2,579.85 0% $2,579.85 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 0.0 ft $13.83 $0.00 0% $0.00 8 sidewalk, asphalt 2.0 in d 350.0 ft L 10.0 ft W 32.7 tons $73.50 $2,401.00 0% $2,401.00 9 sidewalk, concrete 4' width 0.0 ft $11.66 $0.00 0% $0.00 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 2 $49.35 $98.70 0% $98.70 13 Street Landscape 0 Each 0 $105.00 $0.00 0% $0.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 0 $1,365.00 $0.00 0% $0.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 17 pipe, rcp (15 to 48 ") 18.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.30 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 200 ft L 6 ft W 133.3 sy $10.50 $1,400.00 0% $1,400.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (percyforcut or import only 0.0 cy fill 0.0 cy out 0.0 cy bal $3.15 $0.00 0% $0.00 24 CBR tests (1 every 0.1 mi. per mad) 375.0 ft L 0.75 inc of 500' 2 $157.50 $283.50 0% $283.50 25 as -built drawings (1k + price per 0.1 375.0 ft 0.071 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 375.0 ft L 0.071 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 375.0 ft 0.071 mi. 1 Lanes $2,000.00 $1,420.45 0% $1,420.45 29 VDOT maintenance fee (1 In rd, 1 yr) 375.0 ft L 0.071 mi. 1 Lanes $150.00 $106.53 0% $106.53 30 VDOT admin. Cost recovery fee(1 Iar 375.0 ft L 0.071 mi. 1 Lanes $100.00 $0.00 0% $0.00 $23,711.04 $23,711.04 Grading grading (per cy for cut or import only###### cyfill ##### cycut - 8600.0 cy bal $3.15 $122,850.00 0% $122,850.00 Screening Landscaping Street Landscape 88 Each 88 $105.00 $9,240.00 0% $9,240.00 cost sum $515,728.57 $515,728.57 proj mgmt $77,359.29 $77,359.29 contingency $59,308.79 $59,308.79 Total $652,400 $652,400 6/3/2011