Loading...
HomeMy WebLinkAboutSDP201000019 Review Comments Letter of Revision 2 2011-05-09Philip Custer From: Philip Custer Sent: Monday, May 09, 2011 5:47 PM To: Bill Fritz Subject: Engineering Review of CTS Letter of Revision MI I have reviewed the latest Letter of Revision for the CTS operations center (Icover letter dated 4/19/2011) and I have no objection to its approval. I have also talked discussed the design with VDOT since a new pipe is proposed into its system. Their conditions (that the difference in inverts in the VDOT structure is 1ft and a velocity of 3ft per second is experienced in the structure) have been satisfied. When you issue approval, please request three additional copies (color) of the LOR package for me to pass along to the WPO inspectors. Thanks, Phil