Loading...
HomeMy WebLinkAboutWPO201100027 Review Comments Erosion Control Plan 2011-05-25� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Buckingham Circle Water Project — E &S Plan [WP0201100027] Plan preparer: Heather A. Campbell, P.E. [HCAMPBELL @DEWBERRY.COM] Owner or rep.: Rood, Vernon Paul or Judy T Plan received date: 11 May 2011 Date of comments: 26 May 2011 Reviewer: John P. Diez — Current Development - Engineering Technician A. Erosion & Sediment Control plan (WP0201100027) 1. Please provide the General Construction Notes for Erosion and Sediment Control. Please refer the Design Standards Manual. 2. Please provide a utility stream cross symbol (USC) on the E &S plan. 3. Please provide Dust Control (DC). 4. Please provide a construction entrance (CE) on the plans. A symbol on the E &S plan will suffice. 5. Please provide a staging and parking area. If not, please specify that all construction equipments and vehicles will not be on site over night. 6. Silt fence cannot be perpendicular to the contours. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact John Diez at 434 - 296 -5832 orjdiez@albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: jdiez@albemarle.org. \\ Cob- dts01 \cityviewlnk\Docs \2011 \WPO \WPO201100027 - Buckingham Circle Water Project \CDE1- esc_JPD_Buckingham Circle Water Project.doc