Loading...
HomeMy WebLinkAboutWPO201100028 Review Comments Erosion Control Plan 2011-06-07� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Willow Glen —E &S and Stormwater Management Plan [WP0201100020] Plan preparer: Alan Franklin, P.E. [alan @alanfranklinpe.com] Owner or rep.: Dickerson Ridge, LLC Plan received date: 12 May 2011 Date of comments: 7 June 2011 Reviewer: John P. Diez — Current Development - Engineering Technician A. Erosion & Sediment Control plan (WP0201100028) 1. Please provide sediment trap design computation summaries for Sediment Traps #1, #3, and #5. 2. Please provide a sediment trap detail. 3. Please provide Dust Control (DC) to both stages of the project. 4. Please extend the diversion dike on the west side of the site so all of the run from the construction entrance can be captured. 5. Please provide outlet protect to the pipes entering Sediment Trap #3. 6. It appears that some of the proposed contours on stage 2 of the E &S plans do not tie in to existing contours. Please revise. 7. The construction entrance must be the first thing to be installed. Please revise the Zone B -Stage 1 — Erosion Control Sequence. 8. Zone B — Stage 2 ( #6) of the Erosion Control Sequence states the construction of the bridge to connect A and B. It appears that this work is not within the limits of disturbance. In addition, a Utility Stream Crossing must be provided for this work. However, if what is proposed is just the abutment of the bridge, then please state that on the plans 9. Please provide a temporary construction easement from TMP: 32 -50 for the work being done by the construction entrance, In addition, please provide a drainage easement for the pipe discharging to the off -site BMP. B. Stormwater Management plan (WP0201100028) 1. A completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facility must be submitted prior to plan approval. 2. Please provide a Simple Methods Spreadsheet illustrating the removal rates of pre- and post - development in Zone B. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact John Diez at 434 - 296 -5832 orjdiez@albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: jdiez@albemarle.org. \\Cob- dtsOncitvvi —hi:\D—\zoiMwPW w