Loading...
HomeMy WebLinkAboutSDP201100024 Review Comments Final Site Plan and Comps. 2011-05-18Megan Yaniglos From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Wednesday, May 18, 2011 8:59 AM To: Megan Yaniglos Cc: Philip Custer Subject: SDP- 2011 -00024 SOCA Field House -Final Site Plan Follow Up Flag: Follow up Flag Status: Flagged Megan, I have reviewed the referenced plan and have the following comment: 1. Colbert Street West was designed for residential use with parking on both sides. In these residential situations parking is sometimes used and the design assumes that most people will utilize offstreet parking. I am concerned that this site will utilize a lot of the street parking and two way traffic will not be able to pass on the street. This may lead to the need to restrict parking on one or both sides of Colbert Street West. In addition, the intersection with Belvedere Blvd was not designed for commercial type development and the same problem may occur at the throat of the entrance requiring changes. CG -12 Curb ramps need to be provided at the connection with the sidewalk. 3. The entrance detail on sheet 12 appears to be a type CG -9 private entrance. This entrance will need to be a CG -11 commercial entrance. Also, please show the proposed entrance grade. Show sight distances at the proposed entrance. 5. The most current version of the VDOT Road and Bridge Standards is dated 2007. Note #1 under Standards and Specifications on sheet 2 needs to be updated. No steps are permitted on sidewalks within the Colbert Street right of way. Please let me know if you have any questions. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 ioel . den unzioCcbvdot.vir4inia.00v