Loading...
HomeMy WebLinkAboutSDP201100024 Review Comments Final Site Plan and Comps. 2011-05-13`J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: Megan Yaniglos FROM: Alexander J. Morrison, Civil Engineer DATE: 5/2/2011 RE: Site Plan Technical Review for: SDP 2011024- SOCA Field House- Final Site Plan The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 12 inch water line is located approximately 140' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. A 8 inch sewer line is located approximately ON SITE distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Sewer lateral should tie into indicated existing manhole on 8" PVC sanitary sewer line. • NE corner of field house (near IN -2) is encroaching into indicated existing sanitary sewer easement. • Clarify extent of concrete pad and fencing at G -12 in respect to sanitary sewer easement. • Show profile of sanitary sewer and storm sewer crossing. • Show profile of storm sewer and waterline (between meter and tap) crossing. • Tie into existing waterline should be a direct tap. • Provide fixture count so water meter can be sized. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org