HomeMy WebLinkAboutSDP201100033 Review Comments Preliminary Site Plan 2011-06-24`J I1 pJ11 �11'] �J, r, �) ifilly
Service Authority
TO: Megan Yaniglos
FROM: Alexander J. Morrison, Civil Engineer
DATE: June 24, 2011
RE: Site Plan Technical Review for: SDP201100033: Dunlora Forest- Preliminary
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓ A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓ 2. An 12 inch water line is located approximately 65' distant.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓ 4. An 8 inch sewer line is located approximately 65' distant.
5. An Industrial Waste Ordinance survey form must be completed.
✓ 6. No improvements or obstructions shall be placed within existing or future
easements.
7. and plans are currently under review.
8. and plans have been received and approved.
9. No plans are required.
✓ 10. Final water and sewer plans are required for our review and approval prior to
granting tentative approval.
11. Final site plan may /may not be signed.
12. RWSA approval for water and /or sewer connections.
13. City of Charlottesville approval for sewer.
✓ Comments:
• Water easement for future interconnect will be required by ACSA before final site plan
approval.
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthority.org