The application plan for the Health and Rehabilitation Center behind Monticello Fire and Rescue Station
has been reviewed. The following comments are provided for your use;
Off -site grading, drainage and stormwater management on the school property (tmp 91 -13) will need
to obtain easements or approval from the property owner. It is recommended that this be provided
before recommending approval to the rezoning, since the plan is not feasible without it.
2. Off -site grading easements will be required for the retaining walls and grading on the property line of
Dominion Crane and Rigging Inc. It is not possible to construct on the property line without it. If this
permission is not obtained, a 5' minimum distance needs to be provided for safety and erosion control
measures.
3. Off -site grading easements will be required for the grading on the property of Albemarle County
Service Authority. It is not possible to construct the plan without it. If this permission is not obtained,
the plan will need to be revised, or at least 10' minimum distance needs to be provided for safety and
erosion control diversions, in addition to room for a sediment trap on that side of the entrance road.
4. Off -site grading and access easements will be required for the grading on the property of Albemarle
County. It is recommended that the plan be revised to dedicate the necessary right -of -way, and to
construct the ultimate road section in this location, from Mill Creek Drive to the development entrance.
This road section was shown on the Fire Station plans and prior county planning documents.
5. As in the case of the road design, the sanitary sewer and water lines and easements should also
consider the county's long range plans for the property.
6. It is recommended that the odd shape of the outparcel be explained with the rezoning. It will have to
be graded for erosion control measures and staging areas to build this plan.
file: El zma2001 -6 GEB A1bHea1th &RehabCntr