Loading...
HomeMy WebLinkAboutWPO201100040 Review Comments Stormwater Management Plan 2011-07-13i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Korean Community Church WP0201100040, SDP201100034 Plan preparer: Dominion Engineering c/o Michael Myers P.E. [fax 4349791681] Owner or rep.: Korean Community Church in Charlottesville; Yong I Kim & Sang H Son Trustees [fax Unknown] Plan received date: 6 July 2011 Date of comments: 12 July 2011 Reviewer: Max Greene The Water Protection Plans (WP0201100040) submitted 6 July 2011 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: A) Site plans (SDP201100040) 1) Previous engineering comments appear adequately addressed. B) Stormwater Management and Mitigation Plan (WP0201100040) 1) Stormwater plan appears to meet the County Design Standards minimum requirements for approval. C) Erosion Control Plan (WP0201100040) 1) Please include an E &SC narrative per VESCH describing the scope of work to be performed. 2) Please change "temporary stone construction entrance" detail to the "Temporary paved construction entrance" detail found in the "Albemarle County design standards manual'. 3) Please change the drop -inlet protection detail to one with over -flow capacity. 4) For grass stabilization on constructed slopes, the maximum steepness is 3:1. Slopes steeper than 3:1 must be permanently stabilized with landscaping vegetation hardier than grass, which will not require mowing. Please show and state this on the plans. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mcreene @albemarle.orc to schedule an appointment. - [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDE1_MRG_esc,swm,mia_Korean Community Church.doc