Loading...
HomeMy WebLinkAboutWPO201100032 Review Comments Erosion Control Plan 2011-07-20� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Crozet Library ESC & SWM Plan [SDP201100038, WP0201100032] Plan preparer: John D. Reno [john.reno @PHRA.com] Owner or rep.: County of Albemarle c/o Finance Administration RM 149 Plan received date: 3 June 2011 Rev. 1: 7 July 2011 Date of comments: 10 June 2011 Rev. 1: 20 July 2011 Reviewer: John P. Diez — Engineering Technician Engineering has reviewed the final site plan associated with the Crozet Library received 7 July 2011. A. Final Site Plan (SDP201100038) 1. Please update the existing contours on Main Street on the existing conditions sheet. Please revise all necessary sheets to show the new existing contours. (Rev. 1) Comment has been addressed. 2. Please provide date and source of the topographic information. All topography should be at least visually field verified by the designer within the last year. (Rev. 1) Comment has been addressed. 3. A Letter of Intent is needed from the owner of TMP:56A2- 01 -15, TMP:56A2- 01 -14, and TMP:56A2- 01 -12. Grading easements must be recorded prior to final site plan approval. (Rev. 1) Comment has been addressed. 4. VDOT approval must be obtained for any plan affecting public right -of -way. (Rev. 1) Comment has been noted. 5. Please show the existing contour fines of Main Street as dashed lines throughout the set of plans. (Rev. 1) Comment has been addressed. 6. Please provide Albemarle County General Construction Notes. Please refer to the Design Standards Manual. (Rev. 1) Comment has been addressed. B. Erosion and Sediment Control (WP0201100032) 1. Please provide County Erosion and Sediment Control Notes. Please refer to the Design Standards Manual. (Rev. 1) Comment has been addressed. 2. Please update the project description and existing site conditions on the E &S narrative. Please remove anything relating to the construction of a building or library. (Rev. 1) Comment has been addressed. 3. Please update the construction sequence and include the demolition. (Rev. 1) Comment has been addressed. Engineering Review Comments Page 2 of 2 4. Engineering recommends: a. In the initial phase, remove the silt fence on the north and south side of the site and replace them with diversion dikes directing the runoff to a sediment trap at the lowest point of the site on the west side of the property. This will allow the entire site's runoff, including the construction entrance, to be captured by the sediment trap. The silt fence on the west side of the property can remain. (Rev. 1) Comment has been addressed. b. In phase 1, move the sediment trap to the area of the proposed Bio- retention pond. Reshape the sediment trap so it can be converted to the bio- retention pond once the site has been stabilized. (Engineering allows over sizing the sediment trap with a weir to allow runoff to sheet flow from the sediment trap down to the west.) (Rev. 1) Comment has been addressed. 5. Please include all proposed grading within the limits of disturbance for all phases. (Rev. 1) Comment has been addressed. 6. Please provide dust control (DC) in all E &S phases. (Rev. 1) Comment has been addressed. 7. Tree protection must be provided to all trees that are being saved. (Rev. 1) Comment has been addressed. 8. Please show the proposed contours for the sediment trap. (Rev. 1) Comment has been addressed. C. Stormwater Management Plan (WP0201100032) 9. A completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facility must be submitted prior to plan approval. (Rev. 1) Comment has been noted. 10. Please provide Albemarle County General Stormwater Management Notes. Please refer to the Design Standards Manual. (Rev. 1) Comment has been addressed. The Erosion & Sediment Control and Stormwater Management Plans (WP0201100032) submitted 7 July 2011 have received Engineering Review and meet Albemarle County minimum checklist items for approval. Please submit 5 paper copies to engineering for record keeping. A completed copy of the Standard Stormwater Maintenance Agreement and fee for recordation for the stormwater facilities is required prior to final approvaQ I 7-304E] The forms and instructions can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. \\ cob- dts01 \CityViewLnk\Docs \2011 \WPO \WPO201100032 - Crozet Library (Parking Lot) \CDE2 - fsp_esc swm_JPD_Crozet Library (Parking Lot).doc