HomeMy WebLinkAboutSDP201100045 Review Comments Preliminary Site Plan 2011-07-19II
COMMONWEALTH of VIRC NIA
DEPARTMENT OF TRANSPORTATION
CHARLOTTESVILLE RESIDENCY OFFICE
701 VDOT WAY
CHARLOTTESVILLE, VA 22911
GREGORY A. WHIRLEY
COMMISSIONER OF HIGHWAYS
July 19'', 2011
Mr. Glenn Brooks
Department of Engineering and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments July 2151, 2011 site review meeting
Dear Mr. Brooks:
Below are VDOT's comments on the Site Plans for the July 21", 2011 Site Review Committee Meeting:
SDP - 2011 -00045 Old Trail Block 3C- Preliminary (Megan Yaniglos)
1. The site line easements are not the same as the subdivision plat, SUB- 2009 - 000161, which was reviewed
and approved by VDOT on 2 -26 -2010. This plan shows conflicts in the sight line easement for lots 11
and 12 for this phase and 24, 25, and 26 for phase B of the development. In addition, when the phase B
site plan was reviewed it did not show construction for lots 24, 25 and 26 within the sight easement.
2. Lots 12 and 13 driveways are within the throat length of the entrance as shown in VDOT's Road Design
Manual, Appendix F, table 4 -2 and should be removed to avoid conflicts.
3. Recommend dedicating right of way around the corner of Brookley dr. and Old Trail Dr. to one foot
behind the sidewalk.
Please request the applicants provide a written description of revisions with re- submissions. If you have any
questions or comments, please contact me prior to sharing these comments with the applicants.
Sincerely,
Joel DeNunzio, P.E.
Land Use Engineer
VDOT Land Development
434 -589 -5871
WE KEEP VIRGINIA MOVING