Loading...
HomeMy WebLinkAboutSDP201100045 Review Comments Preliminary Site Plan 2011-07-15`J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: Megan Yangilos FROM: Alexander J. Morrison, Civil Engineer DATE: July 8, 2011 RE: Site Plan Technical Review for: SDP201100045: Old Trail Block 3C - Preliminary The below checked items apply to this site. 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 6 inch water line is located approximately (ON PROPERTY) distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. A 8 inch sewer line is located approximately (ON PROPERTY) distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Additional fire hydrant will be required. • Final water and sewer plans will be required for review. • The ACSA requires a written response from our letter dated April 28, 2011 addressed to Mr. Justin Beights. The proposed 20 lots (including office and retail space) for Old Trail Village Block 3 Phase C exceeds the remaining amount from our previous 2 Letters of Agreement. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org