Loading...
HomeMy WebLinkAboutWPO201100052 Review Comments Erosion Control Plan 2011-07-29� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Morey Creek Stockpile ESC Plan [WP0201100052] Plan preparer: Pete Morris [ pmorris @faulconerconstruction.com] Owner or rep.: University of Virginia Health Services Foundation Plan received date: 27 July 2011 Date of comments: 29 July 2011 Reviewer: John P. Diez — Engineering Technician Engineering has reviewed the E &S plan associated with the Morey Creek Stockpile received 27 July 2011. The plan can be approved after the following comments are addressed: A. Erosion and Sediment Control (WP0201100052) i. Please extend the silt fence towards Fontaine Avenue so the runoff from the construction entrance can be captured. 2. Please provide a limits of disturbance. 3. Please show the proposed contours tying in to the existing contours. In addition, provide contours throughout the E &S plan. 4. Please provide a North arrow. \\ cob- dts01 \CityViewLnk\Docs \2011 \WPO \WPO201100052 - Morey Creek Stockpile \CDE1 -esc JPD Morey Creek Stockpile.doc