Loading...
HomeMy WebLinkAboutWPO200900061 Review Comments Mitigation Plan 2011-09-02Philip Custer From: Philip Custer Sent: Friday, September 02, 2011 5:44 PM To: 'fames fulcher' Subject: Northpointe Mitigation James, I've taken a look at the latest submittal of the mitigation plan for North Pointe. I've seen that comment 8 has been addressed with the details on the mattings, but I didn't notice much else changing. I've spoken with Herb White of W &W regarding comment 5 (access) and he said he would address that comment with his latest ESC plan submittal. The three issues listed in my April 15th email do not appear to have been accounted for. One of them, can surely be addressed with Herb's plan if we let him know ( #2 removal of both sides of the pond embankment and perhaps the tires /riser /old culverts). Regarding the in- stream controls, I can probably conditionally approve the plan but would prefer at least a detail in the mitigation narrative. The last item probably needs to be graphically shown (bench at 90 bend below 3- 11A1). When you have a moment, please call me on Tuesday to discuss this. Thanks, Phil (434)296 -5832 x3072