HomeMy WebLinkAboutWPO201100058 Review Comments Erosion Control Plan 2011-08-10ALg�,��
�'IRGINZ�`
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Peace Lutheran Church — Minor Site Plan Amendment (SDP-201100046,
WP0201100058)
Plan preparer:
John Voigut (JV @MADISONSPENCER.COM)
Owner or rep.:
Peace Lutheran Church; Clifton Anderson, Mary Helen Detmer & Danny
Guengerich, Trustees
Date received:
6 July 2011
Rev 1:
9 August 2011
Date of Comment:
20 July 2011
Rev 1:
10 August 2011
Engineer:
John Diez
The Minor Amendment and E &S plans for Peace Lutheran Church, received on 9 August 2011 have been
reviewed.
A. Final Site Plan Review Comments (SDP201100046)
1. It appears that there is proposed grading on the existing site plan. An accurate existing site plan
must be submitted showing the current conditions of the site. In addition, please provide a
demolition plan illustrating what is remaining and what is being removed.
(Rev. 1) Comment has been addressed.
2. Please bubble all that is being amended on the plan. In addition, include the limits of disturbance.
Should the limits of disturbance be 10,000 sf. or greater, an Erosion and Sediment Control plan
will need to be submitted (along with a Water Protection Ordinance application and E &S review
fee).
(Rev. 1) Comment has been addressed.
3. Even though some impervious areas are being replaced with pervious pavers, engineering treats
the pervious pavers as gravel, which means that the c -value for pervious pavers would be 0.7
(whereas, pervious c -value of a grass or wooded area is 0.3). Please provide a Simple Methods
Spreadsheet showing the appropriate acreage and c- values illustrating the removal rate for pre- and
post- development. Should the removal rate increase, engineering will require that the SWM
facility be improved.
(Rev. 1) Comment has been addressed. There is minimal difference in the removal rate between
pre- and post- development. Therefore, no SWM is required.
4. Grading cannot exceed 5% in all parking areas. Please revise. In addition, please provide spot
elevations at the corners of the proposed parking areas.
(Rev. 1) Comment has been addressed.
The Erosion & Sediment Control plan (WP020 1 1 0005 8), submitted 9 August 2011 has received
Engineering Review and meet Albemarle County minimum checklist items for approval.
You may contact Ana Kilmer (Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures.
Once the E &SC bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
\\ cob- dts01 \CityViewLnk\Docs \2011 \WPO \WPO201100058 - Peace Lutheran Church - E &S \CDE2_mia_esc_JPD_11 -46 -
Peace Lutheran Church - Minor.doc