Project: Willow Glen —E &S and Stormwater Management Plan [WP0201100028]
Plan preparer: Alan Franklin, P.E. [alan @alanfranklinpe.com]
Owner or rep.: Dickerson Ridge, LLC
Plan received date: 12 May 2011
Rev. 1: 2 August 2011
Date of comments: 7 June 2011
Rev. 1: 11 August 2011
Reviewer: John P. Diez — Current Development - Engineering Technician
A. Erosion & Sediment Control plan (WP020 1 1 00028)
1. Please provide sediment trap design computation summaries for Sediment Traps #1, #3, and #5.
(Rev. 1) Comment has been addressed.
2. Please provide a sediment trap detail and specifications.
(Rev. 1) Comment has been addressed.
3. Please provide Dust Control (DC) to the plans.
(Rev. 1) Comment has been addressed.
4. Please extend the diversion dike on the west side of the site so all of the runoff from the
construction entrance can be captured.
(Rev. 1) Comment has been addressed.
5. Please provide outlet protect to the pipes entering Sediment Trap #3.
(Rev. 1) Comment has been addressed.
6. It appears that some of the proposed contours on stage 2 of the E &S plans do not tie in to existing
contours. Please revise.
(Rev. 1) Comment has not been addressed.
7. The construction entrance must be the first thing to be installed. Please revise the Zone B -Stage 1
— Erosion Control Sequence.
(Rev. 1) Comment has been addressed.
8. Zone B — Stage 2 ( #6) of the Erosion Control Sequence states the construction of the bridge to
connect A and B. It appears that this work is not within the limits of disturbance. In addition, a
Utility Stream Crossing must be provided for this work. However, if what is proposed is just the
abutment of the bridge, then please state that on the plans
(Rev. 1) Comment has been addressed.
9. Please provide a temporary construction easement from TMP: 32 -50 for the work being done by
the construction entrance, In addition, please provide a drainage easement for the pipe discharging
to the off -site BMP.
(Rev. 1) Comment has been discarded. Applicant has moved the entrance pipe's location so that
the outfall stays s on their property.
10. [New Comment] Update the SWM plans to show the new location of the pipe.
11. [New Comment] As per our conversation on 8/11/11, please provide an energy dissipater by the
outfall of the new located pipe toward the existing SWM basin (ie — level spreader (LS))
B. Stormwater Management plan (WP020 1 1 00028)
1. A completed copy of the standard stormwater maintenance agreement and fee for recordation for
Engineering Review Comments
Page 2 of 2
any stormwater management facility must be submitted prior to plan approval.
(Rev. 1) Comment has been acknowledged.
2. Please provide a Simple Methods Spreadsheet illustrating the removal rates of pre- and post -
development in Zone B.
(Rev. 1) Comment has been addressed.
Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations,
and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these
review comments. Please contact John Diez at 434 - 296 -5832 orjdiez@albemarle.org to schedule an
appointment.
If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email:
j diezgalbemarle. org.
\\ cob- dts01\ CityViewLnk \Docs\2011 \WPO \WPO201100028 - Willow Glen - E &S & SWM - Phase 1 (Zone B) \CDE2-
esc swm JPD Willow Glen - Zone B.doc