Loading...
HomeMy WebLinkAboutWPO201100028 Review Comments Stormwater Management Plan 2011-08-11� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Willow Glen —E &S and Stormwater Management Plan [WP0201100028] Plan preparer: Alan Franklin, P.E. [alan @alanfranklinpe.com] Owner or rep.: Dickerson Ridge, LLC Plan received date: 12 May 2011 Rev. 1: 2 August 2011 Date of comments: 7 June 2011 Rev. 1: 11 August 2011 Reviewer: John P. Diez — Current Development - Engineering Technician A. Erosion & Sediment Control plan (WP020 1 1 00028) 1. Please provide sediment trap design computation summaries for Sediment Traps #1, #3, and #5. (Rev. 1) Comment has been addressed. 2. Please provide a sediment trap detail and specifications. (Rev. 1) Comment has been addressed. 3. Please provide Dust Control (DC) to the plans. (Rev. 1) Comment has been addressed. 4. Please extend the diversion dike on the west side of the site so all of the runoff from the construction entrance can be captured. (Rev. 1) Comment has been addressed. 5. Please provide outlet protect to the pipes entering Sediment Trap #3. (Rev. 1) Comment has been addressed. 6. It appears that some of the proposed contours on stage 2 of the E &S plans do not tie in to existing contours. Please revise. (Rev. 1) Comment has not been addressed. 7. The construction entrance must be the first thing to be installed. Please revise the Zone B -Stage 1 — Erosion Control Sequence. (Rev. 1) Comment has been addressed. 8. Zone B — Stage 2 ( #6) of the Erosion Control Sequence states the construction of the bridge to connect A and B. It appears that this work is not within the limits of disturbance. In addition, a Utility Stream Crossing must be provided for this work. However, if what is proposed is just the abutment of the bridge, then please state that on the plans (Rev. 1) Comment has been addressed. 9. Please provide a temporary construction easement from TMP: 32 -50 for the work being done by the construction entrance, In addition, please provide a drainage easement for the pipe discharging to the off -site BMP. (Rev. 1) Comment has been discarded. Applicant has moved the entrance pipe's location so that the outfall stays s on their property. 10. [New Comment] Update the SWM plans to show the new location of the pipe. 11. [New Comment] As per our conversation on 8/11/11, please provide an energy dissipater by the outfall of the new located pipe toward the existing SWM basin (ie — level spreader (LS)) B. Stormwater Management plan (WP020 1 1 00028) 1. A completed copy of the standard stormwater maintenance agreement and fee for recordation for Engineering Review Comments Page 2 of 2 any stormwater management facility must be submitted prior to plan approval. (Rev. 1) Comment has been acknowledged. 2. Please provide a Simple Methods Spreadsheet illustrating the removal rates of pre- and post - development in Zone B. (Rev. 1) Comment has been addressed. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact John Diez at 434 - 296 -5832 orjdiez@albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: j diezgalbemarle. org. \\ cob- dts01\ CityViewLnk \Docs\2011 \WPO \WPO201100028 - Willow Glen - E &S & SWM - Phase 1 (Zone B) \CDE2- esc swm JPD Willow Glen - Zone B.doc