Loading...
HomeMy WebLinkAboutWPO201100060 Review Comments Erosion Control Plan 2011-10-06ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Albemarle Place ESC Amendment; WPO- 2011 -00060 Plan preparer: Mr. Herb White, PE; W & W Associates Owner or rep.: Albemarle Place EAAP LLC Date received: 11 August 2011 Date of Comment: 6 October 2011 Engineer: Phil Custer, PE The ESC amendment for Albemarle Place (WPO- 2011 - 00060), received on 11 August 2011, has been reviewed. This plan was submitted to address the deficiencies were identified during an inspection of the property performed by DCR. This amendment adds a temporary slope drain (DCR letter item #4), check dams (DCR letter item #2), and sediment traps 4, 5, & 6 (DCR letter item #2). While the temporary slope drain appears to meet state standards and is approvable, there are issues with the applicant's intended methods of addressing DCR's item 2 regarding the disturbed area draining to just silt fence. The ESC plan assumes "Day 1" existing grades and all traps are designed with these watersheds. However, within the first few months of construction operations, existing drainage patterns were disturbed, first, with the installation of a logging road and, second, with the construction of the bypass drainage pipe. To address these concerns, sheet C -10 would need to be updated with the drainage areas observed in the field currently and the sediment trap calculations would need to be updated based on these findings. Also, check dams are not an appropriate trapping or filtering measure. It should be noted, though, that last week another ESC amendment was approved, WPO- 2011 - 00078, that renders this application's sediment trap issue obsolete. That application authorized a slight phasing change that allows the contractor to install the northern sediment basin almost immediately. If the construction of this basin is a matter of days or a week away, there appears to be no reason to find resolution over the sediment trap issue of this application. Therefore, I will pass off these two sheet sets showing the temporary slope drain in the northwest corner to the county inspector, unless the construction of the northern sediment basin will be delayed. In this case, the applicant will need to show conditions currently on site and confirm that sediment traps are sized appropriately and possibly adding a sediment trap in place of the check dams. File: El_ecp_PBC _ wpo- 2011 -00060 Albemarle Place ESC Amendment.doc