I have reviewed the subject plan and have the following comments:
1. Since the initial approval of this plan in 2008, VDOT implemented the WP -2 Standard for
pavement widening. This standard needs to be added to this plan in place of the recommended
pavement structure for the route 250 widening on sheet C -6. The WP -2 standard will require
the contractor to core sample along the existing road and match the existing pavement layers
at a minimum. The standard also will require adjacent lane overlay of surface asphalt. This
overlay will lead to a need for some additional pavement markings on Route 250 to replace
what was milled in the overlay.
Standard UD -4 underdrains will be required along route 250. They will need to run from
the relocated DI -313 to the existing UD -4 on People Place.
3. The surveyed existing conditions should be updated to reflect completed construction of
People Place and improvements made for the Flow Automotive site. Construction at the Flow
site may not have been completed in accordance with the approved plan due to field
conditions. This site will be required to make any necessary adjustments to ensure the right
turn lane is continuous to the recent Flow improvements.
4. All work within the VDOT right of way shall be in accordance with the VDOT 2007 Road
and Bridge Specifications, the VDOT 2008 Road and Bridge Standards and the VDOT Road
Design Manual.
Please let me know if you have any questions.