Loading...
HomeMy WebLinkAboutSDP200800144 Review Comments Final Site Plan and Comps. 2011-08-18From: DeNunzio, Joel D., P.E. [mailto: Joel .DeNunzio @VDOT.virginia.gov] Sent: Thursday, August 18, 20113:16 PM To: Bill Fritz Cc: Philip Custer; Ankita Kot Subject: Crown BMW Final SDP - 2008 -00144 Crown BMW Final SDP - 2008 -00144 W I have reviewed the subject plan and have the following comments: 1. Since the initial approval of this plan in 2008, VDOT implemented the WP -2 Standard for pavement widening. This standard needs to be added to this plan in place of the recommended pavement structure for the route 250 widening on sheet C -6. The WP -2 standard will require the contractor to core sample along the existing road and match the existing pavement layers at a minimum. The standard also will require adjacent lane overlay of surface asphalt. This overlay will lead to a need for some additional pavement markings on Route 250 to replace what was milled in the overlay. Standard UD -4 underdrains will be required along route 250. They will need to run from the relocated DI -313 to the existing UD -4 on People Place. 3. The surveyed existing conditions should be updated to reflect completed construction of People Place and improvements made for the Flow Automotive site. Construction at the Flow site may not have been completed in accordance with the approved plan due to field conditions. This site will be required to make any necessary adjustments to ensure the right turn lane is continuous to the recent Flow improvements. 4. All work within the VDOT right of way shall be in accordance with the VDOT 2007 Road and Bridge Specifications, the VDOT 2008 Road and Bridge Standards and the VDOT Road Design Manual. Please let me know if you have any questions. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 joel.denunzio @vdot.virginia.gov